한국철도학회:학술대회논문집 (Proceedings of the KSR Conference)
- 한국철도학회 2007년도 춘계학술대회 논문집
- /
- Pages.1027-1036
- /
- 2007
서울메트로 접지설비 표준화 방안 연구
A Study on the Unification of the Grounding System of SeoulMetro
- 발행 : 2007.05.17
초록
Since the opening of the Seoul Metro in 1974, the electric railway passengers have been increased rapidly and as the advanced equipments(OC,PSD) were introduced, additional power facilities were built in a limited area for the comfortable transportation environment. Present grounding system were built according to old Electric equipment standards and all the electric signal, communication and electronic equipments were built only for the purposes of protecting building structure, people and electronic equipments. Grounding system which was additionally built in the limited area caused problems with the building structure and it caused secondary damages when earth fault happens. One of the problems is grounding system of the building structure; grounding system does not work properly since grounding equipments are not separated from each other. So, existing grounding system needs to be improved and unified grounding system in the building should be established. The purposed of this study is to analyze all the grounding systems that had been built in different year and to establish unified grounding system of Seoul Metro.
키워드