Abstract

Maximum power consumption was up to 6,228kW in the summer of 2007 due to steady development of industry as well as increased demand of individual. Twenty fossil-Fired Thermal Power Plant for 500MW were underconstructed at present. KEPRI(Korea Electric Power Research Institute) manage 'Development of Advanced Fossil-Fired Thermal Power Generation System' project to construct high efficient power plant of 1000MW capacity for preparing increased demand of power. Design of control logic and data sampling were explained and high efficient control logic was simulated in detail in 'The Development of Next Generation Power Plant Instrument and Control System'(sub-project of 'Development of Advanced Fossil-Fired Thermal Power Generation System' project).

Keywords