한국에너지공학회:학술대회논문집 (Proceedings of the Korea Society for Energy Engineering kosee Conference)
- 한국에너지공학회 2006년도 에너지.가스.기후변화학회 연합춘계학술대회 및 특별심포지움
- /
- Pages.136-139
- /
- 2006
검사주기 최적화를 위한 NCC플랜트의 RBI 구축
Application of Risk Based Inspection for Optimized Inspection Interval on NCC Plants
- Lee Chan-Hun (Korea Gas Safety Corporation) ;
- Han Sang-In (Korea Gas Safety Corporation) ;
- Lee Jae-Hun (Korea Gas Safety Corporation) ;
- Choi Song-Chun (Korea Gas Safety Corporation) ;
- Park Kyo-Sik (Korea Gas Safety Corporation) ;
- Lee Bum-Hee (Honam Petrochemical)
- 발행 : 2006.05.01