해안매립지반에서의 토류가시설 시험시공 및 변경사례

A Field Case on the Pilot Constructions and Changes of a Braced Cut Wall in a Coastal Filled Land

  • 황영철 ((주)유신코퍼레이션 터널부) ;
  • 김기림 ((주)유신코퍼레이션 터널부) ;
  • 김연정 ((주)유신코퍼레이션 지반공학부)
  • 발행 : 2006.10.27

초록

There are many kinds of braced cut wall methods as the sheet pile, SCW, CIP and slurry wall which is adoptable for a deep excavation construction in a coastal filled land. The braced cut wall which has a strong stiffness is very stable but it has the weak point that the construction cost is high. Thus when a braced cut wall is designed, the geotechnical engineers choose the braced cut wall which has more safe and economic in the consideration of surrounding buildings near the construction site. Especially, when the sheet pile method as a braced cut wall is cheesed, the layer order and consistence of a coastal deposit stratum are considered and the pile driving method is also considered. This paper introduces the case that the originally box-type sheet pile wall was changed to U-type and high strength material after the pilot test at the subway construction site in a coastal filled land. This paper also introduces the case that the sheet pile's driving method was changed to special method in the section of the temporary coffer dam which had made when the present coastal filled land was formed.

키워드