쏘일네일링 공법을 적용한 영구 지하굴착 벽체의 설계사례 연구

Design Case Study of Permanent Excavation Wall Using Soil Nailing System

  • 박시삼 (GS건설(주) 기술본부 토질및기초팀) ;
  • 이제만 (GS건설(주) 기술본부 토질및기초팀) ;
  • 유찬호 (홍익대학교 공과대학 토목공학과) ;
  • 김홍택 (홍익대학교 공과대학 토목공학과)
  • Park, Si-Sam (Dept. of Geotech. Engrg., Technical Division, GS E&C Corp.) ;
  • Lee, Je-Man (Dept. of Geotech. Engrg., Technical Division, GS E&C Corp.) ;
  • Yoo, Chan-Ho (Dept. of Civil Engrg., Univ. of Hongik) ;
  • Kim, Hong-Taek (Dept. of Civil Engrg., Univ. of Hongik)
  • 발행 : 2005.10.07

초록

In case of soil nailing system, there have been many attempts to expand into slope and temporary earth retaining system stabilization method since the first ground excavation earth retaining system construction in 1993. Recently, jointing wall, underground wall of buildings and excavation earth retaining wall, construction were increasingly applied for effective utilization of the limited underground space and land application maximized. However, the application of joining wall into retaining wall or building by temporary soil nailing system and design of permanent wall were performed by using Rankine earth pressure theory without considering the distribution of earth pressure in the soil nailing. In this study was performed to introduce the design case by 'Two-Body Translation mechanism (TBTM)' to be able to consider distribution of earth pressure in the soil nailing when designing the permanent jointing wall using soil nailing system for effective utilization of ground space. Also, this study attempts to evaluate the earth pressure change, decreasing effect of wall displacement and increasing effect of stability when advanced soil nailing system is constructed using $FLAC^{2D}$ ${\nu}er.$ 3.30 program and 'Two-Body Translation mechanism'.