PHC말뚝의 새로운 이음방법 개발

Development of New Joining Method for PHC Piles

  • Paik, Kyu-Ho (Dept. of Civil Engineering, Kwandong Univ.) ;
  • Lee, Jung-Hee (Technical Development Team, Hankook Steel Co. Ltd.) ;
  • Park, Yong-Boo (Housing Research Institute, Korea National Housing Co.)
  • 발행 : 2005.03.25

초록

In soft grounds with deep bearing stratum, the PHC piles are generally joined by welding or prefabricated method. However, the existing joining methods have some problems in a side view of workability, quality and cost etc. In this study, a new joining method of PHC piles, which removes the problems of the existing methods, is developed. Static and dynamic load tests in fields as well as laboratory tests such as tensile and bending tests are conducted to investigate the workability and structural safety of PHC piles joined by the new method. The test results show that tensile and bending resistances of the joint part are higher than those of PHC pile itself. PHC piles with 400mm diameter are joined by the new method within 4 minutes while 25 minutes for welding method. Bearing capacities of the PHC piles joined by the new method are nearly the same as those of jointed PHC piles by welding method.

키워드