A study of application for train station of step by step construction method of ADS

자율분산시스템 단계적 구축방식의 철도역 적용에관한 연구

  • Published : 2005.05.01

Abstract

Currently the train traffic control system is built wholly by one package construction. It is under variable circumstance such as variation of signalling equipment and station expansion. This condition reduces system reliability and availability. And the term of system change is longer than 10 years, so it is hard to update to the latest technology and the new function. In order to do the system should be replaced to new one completely. The step by step construction of ADS(Autonomous Decentralized System) is one of the solution. So the simulation of it on the real station help to find system requirement and verify good of online expansion and online test.

Keywords