A Case Study on Construction of Front-Jacking method in Daejeon E.W. perforate Road Project

대전 동서관통도로 Front-Jacking공법 시공사례

  • 김용일 ((주)대우건설 토목기술1팀) ;
  • 황낙연 ((주)대우건설 토목사업) ;
  • 차종휘 ((주)대우건설 대전동서관통도로) ;
  • 장성욱 (서울산업대 철도전문대학원, (주)대우건설 토목기술1팀) ;
  • 이내용 ((주)대우건설 토목기술1팀)
  • Published : 2005.05.01

Abstract

The crossing construction under railroad have two methods which are cut and cover and trenchless method. First, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of soil. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

철도지하횡단공사는 횡단구조물 축조시 개착식과 비개착식 공법으로 구별되는데 개착식 공법은 열차의 비운행시간을 고려하여 시공하는 극히 제한적인 공법인데 반하여 비개착식은 열차의 속도 및 운행시간에 제약을 받지 않는 특징을 갖고 있으며 안전하고 신속한 시공의 장점을 갖고 있다. 비개착식 공법 중 Front Jacking 공법은 소구경의 강관을 압입하여 구조물과의 마찰력과 토압을 최소화 시킨 후 현장에서 제작한 전단면 Precast Box 선단부에 PC강연선과 유압Jack을 이용하여 박스를 지중에 견인하는 공법으로 시공시 안정성과 열차의 정시성 확보가 유리하여 많이 적용되고 있다. 이 공법은 박스단면의 크기 및 연장, 토질조건에 관계없이 시공가능하며 친환경적인 시공을 할 수 있다. 본 고에서는 Front Jacking 공법이 적용된 대전동서관통대로의 철도횡단 시공사례를 소개하고자 한다.

Keywords