A Study on Change of the Existing Railroad Operating and User Effect of High Speed Railroad System in Japan

일본 고속철도 운행경험과 변화

  • Published : 2005.05.01

Abstract

Construction of the Shinkansen was planned on the basis of a traffic volume determined by the Trunk Line Investigation Committee set up within JNR in 1957. Passenger and freight traffic along the vitally important Tokaido Main Line had been steadily increasing, passenger traffic reaching $24\%$ and freight $23\%$ of the total domestic traffic. Train frequency was expected to reach the upper limit in the 1960s. Estimated traffic volume was 13,000 million passenger-km for the opening year 1964 and 20,000 million for 1975. Although the traffic did not reach the estimed figure during 1975 reached about twice the estimated figure for the Tokyo-Shinoska Section. The amazing growth of the national economy was undoubtedly responsible for this.

Keywords