Development and Operation of Durability Mock-Up Test Facilities for Offshore Electricity Structures

해상 전력구조물 내구성 실증 실험장 구축 및 운영

  • 방기성 (한국전력공사 전력연구원 건전성평가그룹) ;
  • 한상묵 (한국전력공사 전력연구원 건전성평가그룹) ;
  • 송영철 (한국전력공사 전력연구원 건전성평가그룹) ;
  • 권병수 (한국전력공사 전력계통건설처 해외사업부)
  • Published : 2005.05.01

Abstract

This paper discusses a strategy and status for development and operation of durability mock-up test facilities for offshore structures. The strategy is examplified and facilitated using an offshore transmission tower crossing the West sea and the Shihwha lake, which was designed and constructed 345kV T/L lines transmitting power from Yeong-Heung fossil power plant to Seoul metropolitan area. Various data for corrosion protection, aging, life-prediction of concrete and steel offshore structures can be obtained using the proposed mock-up test facility. Acquired data will be used for further research on durability, life-prediction, and retrofit of structures. It is important to maintain the safety of 345 kV Yeong-Heung transmission line crossing the Shihwha lake because the offshore structure is one of the critical electric facilities transmitting large power to the metropolitan area. Operation of the offshore transmission tower mock-up is expected to make a significant contribution to stable power supply.

Keywords