Development of Electrical Construction Cost Index for Historical Construction Costs Estimation System
실적공사비 적산제도 활용을 위한 전기공사비지수 개발
- Sohn, H.K. (KERI(Korea Electrotechnology Research Institute)) ;
- Lee, H.K. (KERI(Korea Electrotechnology Research Institute)) ;
- Park, M.Y. (KERI(Korea Electrotechnology Research Institute)) ;
- Park, I.P. (KERI(Korea Electrotechnology Research Institute)) ;
- Kwon, Y.M. (KECA(Korea Electrical Contractors Association)) ;
- Seo, S.S. (KECA(Korea Electrical Contractors Association)) ;
- Kim, K.G. (KECA(Korea Electrical Contractors Association)) ;
- Kim, J.H. (KECA(Korea Electrical Contractors Association))
- 손흥관 (한국전기연구원) ;
- 이형권 (한국전기연구원) ;
- 박민영 (한국전기연구원) ;
- 박인표 (한국전기연구원) ;
- 권용만 (한국전기공사협회) ;
- 서순석 (한국전기공사협회) ;
- 김광곤 (한국전기공사협회) ;
- 김재현 (한국전기공사협회)
- Published : 2005.07.18
Abstract
When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system for building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is showed to development of electrical construction cost index for estimation of historical costs and contract prices.