The Calculation Method of Must-Run Contract Capacity as Market Power Reduction Considered TR Congestion.

혼잡에 의한 시장지배력 삭감방안으로서의 Must-Run 계약용량 산정방안

  • Published : 2004.07.14

Abstract

Transmission congestion is one of the Key factors to local market power in competitive electricity markets. Other players' strategy is also considered. This paper presents an alternative methodology in market power under transmission congestion and other players' strategy. The proposed methodology was demonstrated with the Optimal Power Flow(OPF). Case study is fulfilled by GAMS simulation.

Keywords