Evaluation of ATC in Haenam-Cheju HVDC System Using Cost Calculation

해남-제주간 직류송전시스템의 비용산정을 통한 ATC계산

  • Published : 2004.07.14

Abstract

As the electrical power industry is restructured, the electrical power exchange is extended. In Cheju, demand increases about $10\%$ every year To cope with future demand, HVDC System usage should grow, This paper proposes optimal transfer capability of Haenam-Cheju fm System through cost optimization that considers generating cost, receiving cost and outage cost.

Keywords