Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference (한국측량학회:학술대회논문집)
- 2004.11a
- /
- Pages.361-366
- /
- 2004
A Study on Evaluation of the Priority Order about Framework Data Building
기본지리정보 구축 우선순위 평가에 관한 연구
Abstract
Geographic Information has been used widely for landuse and management, city plan, and environment and disaster management, etc., But geographic information has been built for individual cases using various methods. Therefore, the discordancy in data, double investment, confusion of use and difficulty of decision supporting system have been occurred. In order to solve these problems, national government is need to framework database. This framework database was enacted for building and use of National Geographic Information System and focused on basic plan of the second national geographic information system. Also, the framework database was selected of eight fields by NGIS laws and 19 detailed items through meeting of framework committee since 2002. In this research, The 19 detailed items( road, railroad, coastline, surveying control point etc.,) of framework database consider a Priority order, In the result of this research, the framework database is obtain to a priority order for building and the national government will carry effectively out a budget for the framework database building. Each of 19 detailed items is grouping into using the priority order of the framework database by AHP analysis method and verified items by decision tree analysis method. The one of the highest priority order items is a road, which is important for building, continuous renovation, and maintain management for use.