An Upending Stability for Offshore Jacket

대형 해양 자켓의 직립 안정성 고찰

  • Published : 2003.05.23

Abstract

As the upending is one of the critical steps in the installation of offshore structure, datail procedure of upending operation is studied in the paper. For larger offshore structure installation, launching method is often applied. However after launching, the upending process is to be followed. To ensure successful upending operation, datail process is analysed considering various factors affecting on the operation including reserved buoyancy, free flotation position, seabed clearance, ballast and hook load. To investigate the influence of each factor on the procedure, twelve numerical jacket models with various dimensions are simulated and studied. From the study, it is revealed that the increase of buoyance and decrease of self weight generate a large seabed clearance. The law seabed clearance during flooding creates higher hook load and height. The paper also introduces a guideline for the related structure design and construction with the effects of contribution factors in the upending operation.

Keywords