Proceedings of the Korea Concrete Institute Conference (한국콘크리트학회:학술대회논문집)
- 2003.11a
- /
- Pages.301-304
- /
- 2003
Hydration Heat Analysis of Wall according to Placement Length
벽체 타설길이별 수화열 해석
Abstract
Nowadays, hydration heat analysis using FEM is common in thermal crack control of concrete structure. Many kinds of general FEM programs for hydration heat analysis are used in practice. But there are some problems in this using. In this study hydration heat analysis of wall according to placement length are performed. In this results we could get two conclusions. First, general structures like wall having general geometry and construction condition have similar behavior. So it is not necessary to analysis thermal crack in every case. Second, the results of 2D analysis is possible to be applied instead of those of 3D analysis because the results of 2D analysis is similar to 3D analysis in long wall having about 15~18m or over length at 3m height.
Keywords