Proceedings of the Korea Concrete Institute Conference (한국콘크리트학회:학술대회논문집)
- 2003.05a
- /
- Pages.133-138
- /
- 2003
Calculation and Measurement of Column Shortening High-Rise RC Structure
초고층 RC구조의 기둥축소량 해석 및 현장계측
Abstract
Axial shortenings of wall and columns were measured on level 2 and precise leveling between wall and columns were surveyed on level 5 at the Galleria Palace structure. Measured and surveyed shortening values were compared with the analysis results at the earlier stage on the process of construction for evaluating the predicted values. Though measured values represent relatively low and scattered values at earlier construction stage, probably they show similar slope curves to predicted ones with the progress of time.
Keywords