Proceedings of the Korean Institute Of Construction Engineering and Management (한국건설관리학회:학술대회논문집)
- autumn
- /
- Pages.490-493
- /
- 2002
Supply Chain Modelling for JIT of the Costruction
건설공사의 적시생산을 위한 자재공급 모델링 -전기설비 케이블덕트관 사례-
Abstract
There have to be a pooled procurement in order to control construction in every stage. And we need also efficient supply chains to utilize the process. Researching and developing the method, which make it possible the supply chain management by modeling for Internet-enabled pooled procurement in construction, through breakdown in materials is currently in-progress the inside and out side of country. The objective of this paper is to find a reform while modeling the production process of cable duct moreover understanding the wasting factors in each step.
건설 전단계에서 통합적인 관리를 위해서는 건설 전단계에 걸친 관리가 이루어져야 하고, 이러한 프로세스가 원활히 이루어지기 위해서는 자재의 원활한 조달이 이루어져야 한다. 현재 국내
Keywords