Proceedings of the Korean Institute Of Construction Engineering and Management (한국건설관리학회:학술대회논문집)
- autumn
- /
- Pages.423-426
- /
- 2002
Development of a Cost Index for Site Developing Project
단지조성공사용 공사비 지수의 개발
- Published : 2002.11.01
Abstract
The foundation for developing a cost estimation system based on historical data has been being prepared in Korea. Historical data is a priori of developing a cost estimation model. Cost Index, one of the historical data, is used to estimate construction cost and to adjust the amount of contract money in the foreign country, whereas it is not used in domestic except for the road construction project in Korea. Construction cost indices can be used by an estimator in tender analysis, pricing, price adjustment, cost planning, and forecasting. In this regards, this paper identified the problems in developing Cost Index evaluation process by comparing the standard of framing Cost Index used in British to the one used in Korea. Then, the scheme for improving a Cost Index required for Site Developing Construction was proposed. Twenty-two cases of engineering estimate data were used to compare the domestic standard to the foreign one in deriving a Cost Index.
현재 우리나라에서는 건설공사비 산출방식을 실적공사비 적산제도로 전환하기 위한 기반을 마련 중에 있다. 실적공사비 적산제도가 원활하게 시행되기 위해서는 이에 필요한 각종 실적자료가 필요하다. 공사비 지수는 이러한 실적자료의 하나로서 외곽의 경우에는 정부 및 민간기관에서 공사비 지수를 제공해 주고 있지만, 국내의 경우는 도로공사를 제외하고는 건설공사에서 적용할 수 있는 공사비 지수가 공표되지 않고 있는 실정이다. 공사비 지수는 건설공사의 입찰가 분석, 단가 및 공사비 조정, 공사비 예측을 위해 사용하는 것으로, 본 연구에서는 단지조성공사 설계내역서 22개를 표본으로 하여 우리나라와 영국에서 사용되고 있는 공사비 지수 작성기준을 비교하여 국내의 공사비 지수 산출방식의 문제점을 분석하였으며, 그 개선방안과 함께 단지공사용 공사비 지수를 작성하여 제시하였다.