Turbine Cycle Thermal Performance Analysis of Advanced Power Reactor 1400

신형경수로(APR1400)의 터빈 싸이클 열성능 분석

  • 정대율 (한전 전력연구원 신형원전개발센타) ;
  • 임혁순 (한전 전력연구원 신형원전개발센타) ;
  • 정대욱 (한전 전력연구원 신형원전개발센타) ;
  • 허균영 (한국과학기술원 원자력공학과)
  • Published : 2001.06.27

Abstract

Advanced Pressurized Reactor 1400(APR-1400), which is a standard evolutionary advanced light water reactor(ALWR), has been developed from 1992 as one of long-term Government Project(G-7). The APR-1400 is designed to operate at the rated output of 4000MWt to produce an electric power output of around 1450MWe. The balance of plant (BOP) for the secondary system consists of main steam, feedwater, condensate, turbine generator and auxiliary system. In this paper, we describe the major design features of secondary component, balance of plant configuration, and then the turbine cycle thermal performance evaluation using PEPSE code.

Keywords