울릉도 풍력발전 계통연계 문제점 및 대책

Technical Problems and solution based on Connection of Ullung Wind Power Plant into Power Distribution System

  • Yoon, G.G. (Korea Electric Power Research Institute) ;
  • Lee, W.S. (Korea Electric Power Research Institute) ;
  • Kim, B.H. (Korea Electric Power Research Institute) ;
  • Lee, S.K. (Korea Electric Power Research Institute)
  • 발행 : 2001.10.26

초록

The wind power equipment of Ullung island is composed of a hybride type of wind powers and diesel generators. The wind power generation in Ullung island is, howerever, not smooth due to the small capacity and weekness of existing power systems and line. Therefore, it is the purpose of this study to describe the technical problems and its solution through the investigation of actual conditions.

키워드