Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 2001.10a
- /
- Pages.305-307
- /
- 2001
Technical Problems and solution based on Connection of Ullung Wind Power Plant into Power Distribution System
울릉도 풍력발전 계통연계 문제점 및 대책
- Yoon, G.G. (Korea Electric Power Research Institute) ;
- Lee, W.S. (Korea Electric Power Research Institute) ;
- Kim, B.H. (Korea Electric Power Research Institute) ;
- Lee, S.K. (Korea Electric Power Research Institute)
- Published : 2001.10.26
Abstract
The wind power equipment of Ullung island is composed of a hybride type of wind powers and diesel generators. The wind power generation in Ullung island is, howerever, not smooth due to the small capacity and weekness of existing power systems and line. Therefore, it is the purpose of this study to describe the technical problems and its solution through the investigation of actual conditions.
Keywords