3D PLM(Product Life cycle Management) & CPC(Collaborative Product Commerce)

  • Published : 2001.08.01

Abstract

Level 0: The Marekting Buzzword : □Confusion between DMU and Visualization □Having a Mobile Data Viewer/Analyser is Anyway a Prerequisite Level 1: Digital Pre-Assembly (DPA): □Building Digital Prototype before Physical Build □Usually a job for Packaging or Prototype Teams □Usually no time Left to take Feed-back into account before Actual Build Level 2: Design in Context: □All Designers within Car Maker do Local DMU before DPA Level 3: Design in Extended Context □Design in Context Expanded to Suppliers(omitted)

Keywords