A study on the cracking of tunnel lining by measurement and numerical analysis

계측 및 수치해석을 통한 터널 라이닝의 균열 원인 연구

  • 황학 (LG건설 기술연구소) ;
  • 정헌철 (LG건설 기술연구소/연구개발팀) ;
  • 김유석 (LG건설 기술연구소/연구개발팀)
  • Published : 2001.03.01

Abstract

In this research, the cracking of tunnel concrete lining was investigated and analyzed through long-term measurement and nonlinear numerical analysis. For one year after the casting of lining, the stresses and strains were measured by the sensors installed in hard rock tunnel lining. The measurements showed that only small stresses which were less than cracking stress occurred in every survey sections regardless of sensor directions. It could be induced that the external load applied to the lining was small or ignorable. Also, it was carried out short-term numerical analysis based on such site condition as ambient temperature, the- degree of overbreak and mold staying period. Long-term numerical analysis based on creep & shrinkage and nonlinear cracking was carried out. The output showed that construction condition and ambient environments could make the lining concrete crack without external loads. The cracks formed in this process does not indicate the structural instability of the tunnel.

Keywords