Proceedings of the Korea Concrete Institute Conference (한국콘크리트학회:학술대회논문집)
- 2001.11a
- /
- Pages.853-858
- /
- 2001
The study of determination proper nose properties, used for I..L.M constructing economic long spans bridge.
경제성과 장대경간 구성을 구현할 수 있는 I.L.M교량에 사용되는 추진코의 적정제원 산정에 관한 연구
Abstract
The PSC bridge being built by ILM may have greater bending moment during its construction rather than after completion. When it occurs, Engineer should suggest to reduce stress-resultants than to make bigger cross-section with considering stability ,economics, and proper span-to-depth ratio. The used method is to install extruded nose at the end of girder. It substitutes the weighted segment for the light. From the reference, the stiffness of extruded nose, is 1/10 of the main girder, and the length is 60 to 70% of the length of the span, with little justification. In this study, the proper length and stiffness of the nose element is determined by the parametric study and idealizing procedure. The results about the extruded nose through the mixing of the parameter of its stiffness and length, the proper length of extruded nose is 80% of the longest span and the proper stiffenss is 13% of the bending stiffness of the superstructure and the proper length of extruded nose is 70% of the longest span and the proper stiffness is 9.5% of the bending stiffness of the superstructure.
Keywords