Proceedings of the Korea Concrete Institute Conference (한국콘크리트학회:학술대회논문집)
- 2000.04a
- /
- Pages.163-168
- /
- 2000
Proposition of the Removal Time of From Based on the Analysis of Strength Development of Concrete Using Blast-furnace Slag Cement
고로슬래그 시멘트를 사용한 콘크리트의 강도 증진 해석에 의한 거푸집 존치기간의 제안
Abstract
In this paper, removal times of from from concrete using OPC( Ordinary Portland Cement) and BSC(Blast-furnace Slag cement) are suggested by appling logistic curve, which evaluates the strength development of concrete with maturity. W/B, kinds of cement and curing temperatures are selected as test parameters. According to the results, the estimation of strength development by logistic curve has a good agreement between calculated values. As for the removal time of from suggested in this paper, as W/B increase, curing temperature decrease and BSC in used, removal they times of from are shown to be kept longer. Removal times of from from concrete using OPC suggested in this paper are shorter by about 2~3day than those of standard specifications provided in KCI in the rang of over
Keywords