PCCR(ECCP) Design of Great Man-made River Project

GMR 공사에 적용된 PCCP(EC)의 설계

  • 김영수 (정회원, 동아건설산업(주) PCC관설계 T/F 팀장) ;
  • 최인식 (동아건설산업(주) PCC관설계 T/F팀) ;
  • 신경수 (동아건설산업(주) 해외공사팀,) ;
  • 김두영 (동아건설산업(주) 기술연구소장) ;
  • 이원재 (동아건설산업(주) 기술담당, 상무)
  • Published : 1998.10.01

Abstract

Prestressed Concrete Cylinder Pipe(PCCP) is used in water transmission pipeline of the Great Man-made River Project(GMR Project). In domestic area, PCCP is used for water cooling systems of Uljin and Youngkwang nuclear power plants. In abroad, especially in the United States and Canada PCCP supplies virtually every metropolitan area with raw and treated water. Compared with other pipe types, PCCP manufacturing cost is dear. But total cost can be considered as economical due to low installation and maintenance cost. Previously, the designs of PCCP were generally determined from one of two appendices in American Water Works Association(AWWA)standard C301 which provided two design methods-cubic parabola design method and stress analysis design method. In 1992, the design procedure for PCCP expanded from two alternatives to the most huge and complex AWWA standard C304. Because C304is so large, it takes too much time for the engineer to read and understand the design concepts and procedures. In this paper, the AWWA C304 design procedures are segmented into simple, understandable sections and concepts and explained. Each section or concepts is compared to the previous design procedure to highlight the revisions and reasons for them. Also the PCCP design program was developed and the design program results are compared with the calculations of the GMR project design consultant.

Keywords