Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 1998.07c
- /
- Pages.1103-1105
- /
- 1998
A Study on replacing transmission lines with STACIR for increasing power transmission capacity in the 345kv transmission system
345KV 송전선로의 송전용량 증대를 위한 STACIR 전선교체기술
- Kim, Yeong-Han (Shinseongnam Power Office, Korea Electric Power Corp.) ;
- Bang, Hang-Kwon (Shinseongnam Power Office, Korea Electric Power Corp.) ;
- Cho, Dae-Sung (Shinseongnam Power Office, Korea Electric Power Corp.)
- Published : 1998.07.20
Abstract
It is becoming more and more difficult to construct new transmission lines because of many social problems. According to the load increase, Some of existing transmission lines will be heavy loaded over the limit. To solve this situation, one of method is peformed by replacing existing ACSR transmission lines with STACIR for increasing power transmission capacity in the 345kv transmission system. This paper presents several techniques for design and construction of transmission line replacement based on the actual experience in the 345kv Shinseongnam-Shinsiheung and Shinseongnam-Shinyeongseo transmission lines.
Keywords