A Study on the Optimal Operation of the Private Cogeneration System

민생용 열병합발전시스템의 최적운전에 관한 연구

  • Published : 1996.07.22

Abstract

This paper presents the optimal operation scheduling of the private cogeneration system connected with auxiliary equipments. And the optimal size of auxiliary equipments is determined through evaluations of the minimum operation cost. The optimal operation scheduling is established by using the linear programming method. Simulation results show that the auxiliary boiler is operated as an economical facility but the thermal storage tank is used as a back up facility for emergency.

Keywords