Design of a Prototype Fibre Optic Based Monitoring and Control System for Future KEPCO's 765kV Substation

765kV 변전소 감시제어용 시범시스템

  • 장문명 (한국전력공사 송변전건설처 765kV 추진반) ;
  • 정상진 (한국전력공사 송변전건설처 765kV 추진반) ;
  • 최종협 (한국전력공사 송변전건설처 765kV 추진반) ;
  • 박종명 (한국전력공사 송변전건설처 765kV 추진반)
  • Published : 1996.07.22

Abstract

Instead of point-to-point hard wiring between substation yard equipments and SCADA RTU(Remote Terminal Unit), fibre optic cable will be used in the portion between Local Units and Central Unit in the future KEPCO 765kV substation. The connections between substation yard equipments and nearby Local Unit remain the same hard wiring. The new fibre optic system will provide security especially during ground faults and is immune to electrical noise. A prototype system will be manufactured and installed in the existing 154kV Yeosan Substation by the end of July this year and operated for one year. By incorporating the operation experiences acquired in the system, an improved system will be commercially applied to 765kV Shin-An-Seong Substation where 345kV GIS will be installed initially and act as the switching station in the year 1998. The system is composed of one Central Unit and several Local Units. The Central Unit is composed of two workstation level computers, one is in operation and the other backup, and a Communication Control Unit. The Local Unit uses the existing SCADA RTU technology and takes the form of a distributed one. Between the Communication Control Unit and Local Units, the fibre optic system with star-coupler is used.

Keywords