Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 1996.07b
- /
- Pages.695-697
- /
- 1996
Uncertainty Indices Determination and MCDM for IRP
IRP를 위한 블확실성 지표산정과 다속성 의사결정
- Kim, Chang-Soo (Korea Electrotechnology Research Inst.) ;
- Kwun, Young-Han (Korea Electrotechnology Research Inst.) ;
- Kim, Kwang-In (Korea Electric Power Corp.)
- Published : 1996.07.22
Abstract
Main theme of this paper is to evaluate the degree of risk due to the uncertainly of the future, especially for the long-term integrated resource planning (IRP) in electric utility. The measures of uncertainty for dealing with planning risk in the IRP context include robustness and flexibility of each candidate resource plan. The uncertainty indices are treated as decision criteria, or attributes, same as economic efficiency or reliability criteria in the multi-attribute decision-making (MCDM) procedure of IRP.
Keywords