• Title/Summary/Keyword: zero-distance construction

Search Result 4, Processing Time 0.02 seconds

Optimization of construction support scheme for foundation pits at zero distance to both sides of existing stations based on the pit corner effect

  • Tonghua Ling;Xing Wu;Fu Huang;Jian Xiao;Yiwei Sun;Wei Feng
    • Geomechanics and Engineering
    • /
    • v.38 no.4
    • /
    • pp.381-395
    • /
    • 2024
  • With the wide application of urban subway tunnels, the foundation pits of new stations and existing subway tunnels are becoming increasingly close, and even zero-distance close-fitting construction has taken place. To optimize the construction support scheme, the existing tunnel's vertical displacement is theoretically analyzed using the two-stage analysis method to understand the action mechanism of the construction of zero-distance deep large foundation pits on both sides of the existing stations; a three-dimensional numerical calculation is also performed for further analysis. First, the additional stress field on the existing tunnel caused by the unloading of zero-distance foundation pits on both sides of the tunnel is derived based on the Mindlin stress solution of a semi-infinite elastic body under internal load. Then, considering the existing subway tunnel's joints, shear stiffness, and shear soil deformation effect, the tunnel is regarded as a Timoshenko beam placed on the Kerr foundation; a sixth-order differential control equation of the tunnel under the action of additional stress is subsequently established for solving the vertical displacement of the tunnel. These theoretical calculation results are then compared with the numerical simulation results and monitoring data. Finally, an optimized foundation pit support scheme is obtained considering the pit corner effect and external corner failure mode. The research shows a high consistency between the monitoring data,analytical and numerical solution, and the closer the tunnel is to the foundation pit, the more uplift deformation will occur. The internal corner of the foundation pit can restrain the deformation of the tunnel and the retaining structure, while the external corner can cause local stress concentration on the diaphragm wall. The proposed optimization scheme can effectively reduce construction costs while meeting the safety requirements of foundation pit support structures.

A Study on the Effective Maintenance Method of the Stair Passage Leading Light installed In the Shopping Building (상가건물 계단통로유도등의 유지관리 효율화 방안에 관한 연구)

  • Lee, Young-Sam
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.1-8
    • /
    • 2016
  • This study was conducted by survey and inspection of stair passage leading lights in shopping buildings which are more than 5 stories and have an underground parking lot located at Pyeongtaek-si and Seongnam-si. Number of shopping building for this study is 30 and of stair passage leading light inspected by two lights in each shopping building is 60. The result of this study is that the type of installed leading lights is LED(77%), and 60% of leading lights has problem such as no cleaning, scratch and discoloration, etc. The height of installed leading lights meets the fire law which is less than 1m from the floor. Visible condition of leading lights is good except some leading lights which have a little visible problem due to banner advertisement. 37% of standby power has flickered and went out. 93% of total leading lights meets the fire law which is more than 1lux from 0.5m distance, but cold cathode fluorescent lamps(CCFLs) have the problem which not meets proper brightness level based on fire law. In additional measurement result, zero lux of leading lights is 32%(from 1m distance), 68%(from 1.5m distance) and 98%(from 2m distance). Leading light is very important facility because it is eyes and guide when emergency. Therefore, proper fire facility operating function inspection and total detailed inspection are important to keep the good condition of leading light except simple visual check, and also improvement in law system of type approval, fire construction inspection and illumination level will be needed.

Mechanical evolution law and deformation characteristics of preliminary lining about newly-built subway tunnel closely undercrossing the existing station: A case study

  • Huijian Zhang;Gongning Liu;Weixiong Liu;Shuai Zhang;Zekun Chen
    • Geomechanics and Engineering
    • /
    • v.35 no.5
    • /
    • pp.525-538
    • /
    • 2023
  • The development of a city is closely linked to the construction and operation of its subway system. However, constructing a new subway tunnel under an existing station is an extremely complex task, and the deformation characteristics and mechanical behavior of the new subway tunnel during the excavation process can greatly impact the normal operation of the existing station. Although the previous studies about the case of underpass engineering have been carried out, there is limited research on the condition of a newly-built subway tunnel that closely undercrossing an existing station with zero distance between them. Therefore, this study analyzes the deformation law and mechanical behavior characteristics of the preliminary lining of the underpass tunnel during the excavation process based on the real engineering case of Chengdu Metro Line 8. This study also makes an in-depth comparison of the influence of different excavation methods on this issue. Finally, the accuracy of numerical simulation is verified by comparing it with on-site result. The results indicate that the maximum bending moment mainly occurs at the floor slab of the preliminary lining, while that of the ceiling is small. The stress state at the ceiling position is less affected by the construction process of the pilot tunnel. Compared to the all-in-one excavation method, although the process of partial excavation method is more complicated, the deformation of preliminary lining caused by it is basically less than the upper limit value of the standard, while that of the all-in-one excavation method is beyond standard requirements.

Latency in the Architectural Space of Mies van der Rohe (미스 반 데어 로에 건축공간의 잠복성)

  • Chung, Mann-Young;Choe, Eun-Guk
    • Journal of architectural history
    • /
    • v.15 no.3
    • /
    • pp.119-135
    • /
    • 2006
  • This study based on the hypothesis which the spatial qualities in the Mies's early works are not extinct but potentially immanent in his latter works. In Mies's early works, destruction of outline, centrifugal extension of fluid space, and asymmetry are distinctly showed. These qualities probably revert to the indefiniteness of space. In Mies's latter works, however, these dynamic qualities are disappeared. Geometrically precise outline and exact grid structure represent universal space derived from zero-degree pure box. These qualities probably revert to tile definiteness of space, characterized by the unmovable emptiness. Although Mies works vary in external form, his expression technique of space reveals continually both the qualify of definitive and indefinitive space. For example, in the Museum for a Small City(1942) unbuilt project. elements defined by the perspective are fixed and static, but elements defined by the collages are floated and dynamic. The former reigns over the realized buildings of Mies, while the latter seems to be latent in terms of Schein which transcends reality. If we can penetrate this point, it's possible to read the other side of Mies' architectural works, distinct from both the canonized interpretation and the excessive criticism. Point is that later works of Mies must be understood as interplay of universal space appeared as phenomenon and flowing elements latent in. Architectural space of Mies keeps a distance with actual space through latent manner of being while preserves the empirical actuality It provides us with an occasion which appears only in an instant, in which even the ordinary things reveal its poetics.

  • PDF