• 제목/요약/키워드: workflow modeling

검색결과 115건 처리시간 0.029초

A Study on the Implement of AI-based Integrated Smart Fire Safety (ISFS) System in Public Facility

  • Myung Sik Lee;Pill Sun Seo
    • 국제초고층학회논문집
    • /
    • 제12권3호
    • /
    • pp.225-234
    • /
    • 2023
  • Even at this point in the era of digital transformation, we are still facing many problems in the safety sector that cannot prevent the occurrence or spread of human casualties. When you are in an unexpected emergency, it is often difficult to respond only with human physical ability. Human casualties continue to occur at construction sites, manufacturing plants, and multi-use facilities used by many people in everyday life. If you encounter a situation where normal judgment is impossible in the event of an emergency at a life site where there are still many safety blind spots, it is difficult to cope with the existing manual guidance method. New variable guidance technology, which combines artificial intelligence and digital twin, can make it possible to prevent casualties by processing large amounts of data needed to derive appropriate countermeasures in real time beyond identifying what safety accidents occurred in unexpected crisis situations. When a simple control method that divides and monitors several CCTVs is digitally converted and combined with artificial intelligence and 3D digital twin control technology, intelligence augmentation (IA) effect can be achieved that strengthens the safety decision-making ability required in real time. With the enforcement of the Serious Disaster Enterprise Punishment Act, the importance of distributing a smart location guidance system that urgently solves the decision-making delay that occurs in safety accidents at various industrial sites and strengthens the real-time decision-making ability of field workers and managers is highlighted. The smart location guidance system that combines artificial intelligence and digital twin consists of AIoT HW equipment, wireless communication NW equipment, and intelligent SW platform. The intelligent SW platform consists of Builder that supports digital twin modeling, Watch that meets real-time control based on synchronization between real objects and digital twin models, and Simulator that supports the development and verification of various safety management scenarios using intelligent agents. The smart location guidance system provides on-site monitoring using IoT equipment, CCTV-linked intelligent image analysis, intelligent operating procedures that support workflow modeling to immediately reflect the needs of the site, situational location guidance, and digital twin virtual fencing access control technology. This paper examines the limitations of traditional fixed passive guidance methods, analyzes global technology development trends to overcome them, identifies the digital transformation properties required to switch to intelligent variable smart location guidance methods, explains the characteristics and components of AI-based public facility smart fire safety integrated system (ISFS).

암시적/명시적 협업 프로세스 언어의 비교분석 (Comparison and Analysis of Implicit and Explicit Collaboration Process Languages)

  • 조명현;박정업;설주영;백문홍;손진현
    • 정보처리학회논문지D
    • /
    • 제13D권5호
    • /
    • pp.671-682
    • /
    • 2006
  • 지금까지 비즈니스 프로세스 관리에 대한 표준 및 다양한 연구 활동들이 수행되어 왔다. 하지만 아직 범용적인 협업 프로세스 언어 표준이 규정되어 있지 않은 상태이기 때문에, 관련 연구 활동들이 체계적이지 못한 면이 있다. 본 연구는 대표적인 협업 프로세스 언어들(BPEL4WS, BPML, WSCI, WS-CDL, BPSS 등)의 비교 분석을 통하여 협업 프로세스 언어를 올바르게 선택하고 활용하는 가이드라인을 제시하고자 한다. 이를 위해, 본 논문에서는 먼저 협업 방식에 따라 암시적 협업과 명시적 협업을 정의하고 세 단계의 순차적인 방법론에 따라 협업 프로세스언어들의 특징을 비교 분석한 결과를 제시한다. 첫 번째 단계로, Bernauer가 제안한 협업 환경의 프레임워크와 협업 프로세스 모델링 절차에 따라 협업 프로세스 언어가 가져야 할 필수 요소를 추출한다. 두 번째 단계로, 추출된 필수 요소를 기반으로 협업 프로세스 언어들의 특징을 분석한다 마지막으로 협업 프로세스 언어들의 특징을 반영하여 실제 비즈니스 프로세스를 구성하는 완전한 예제를 제시한다.

BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안 - BIM 소프트웨어와 EXCEL VBA를 이용한 자동화과정을 중심으로 - (A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan - Case Study on Automation Process Using BIM Software and Excel VBA -)

  • 류재호;황종민;김솔이;서화영;이지현
    • 한국BIM학회 논문집
    • /
    • 제12권2호
    • /
    • pp.49-59
    • /
    • 2022
  • The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

경상분지 백악기 화강암 암반에 대한 삼차원 수리전도텐서 추정사례 (Estimation of 3-D Hydraulic Conductivity Tensor for a Cretaceous Granitic Rock Mass: A Case Study of the Gyeongsang Basin, Korea)

  • 엄정기;이다혜
    • 지질공학
    • /
    • 제32권1호
    • /
    • pp.41-57
    • /
    • 2022
  • 본 연구는 부산 기장지역에 분포하는 백악기 흑운모 화강암에 대한 사례연구를 통하여 DFN(discrete fracture network) 유동해석 기반의 REV(representative elementary volume) 크기 및 삼차원 수리전도텐서 추정을 위한 워크플로우를 제시하였다. 연구지역을 대표하는 이차원 DFN에 대하여 절리텐서의 일차불변량을 이용하여 절리의 빈도 및 길이가 보정되었다. 현장수압시험을 수행하여 선형의 등가유로관으로 취급된 현장의 절리에 대한 유효수리간극이 추정되었다. 연구지역의 이차원 DFN 블록에 대한 REV의 크기는 블록 크기에 따른 지향적 블록수리전도도의 변화를 분석하여 20 m × 20 m으로 결정하였다. 연구지역의 이차원 DFN에 대하여 산정된 지향적 블록수리전도도는 현장의 수리적 거동과 관련하여 강한 이방성을 지시한다. 다양한 방향으로의 이차원 DFN에서 산정된 지향적 블록수리전도도를 바탕으로 연구지역의 절리성 암반에 대한 삼차원 수리전도텐서가 추정되었다. 삼차원 수리전도텐서의 주성분 방향은 현장에서 구분된 주 절리군의 방향과 일치한다.