• Title/Summary/Keyword: work types

Search Result 3,097, Processing Time 0.027 seconds

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.

Risk Assessment Method for Activities of Apartment Construction (공동주택 건축공사 단위작업의 위험성 평가 방법)

  • Park, Sungpyo;Choi, Jae-Wook;Lee, Chansik
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

The Role of Job Autonomy Influencing on Creative Behavior in the Smart Work Context (스마트워크에서 직무자율성이 창의적 행위에 미치는 영향)

  • Yong-Young Kim
    • Journal of Industrial Convergence
    • /
    • v.21 no.4
    • /
    • pp.13-22
    • /
    • 2023
  • Due to COVID-19, organizations are rapidly changing the way they work by providing telecommuting and flexible work, and by expanding Smart Work spaces. In a Smart Work situation, workers have improved their job autonomy to choose their work methods, hours, and places. However, previous studies do not reflect the Smart Work situation and there are limitations to still using the previous job autonomy concept and measurements. To overcome these problems, this study derived job autonomy types such as methods, scheduling, criteria, time, and place applicable to Smart Work environments and verified that the five types of job autonomy have a statistically significant positive effect on Smart Workers' creative behavior. This study is meaningful in that it categorized job autonomy into five types applicable to Smart Work by adding temporal and spatial flexibility to the traditional job autonomy concept such as method, scheduling, and criteria autonomy and provided the basis for subdividing and evaluating the operation performance of Smart Work through multi-dimensional job autonomy verification.

Derivation of External Exposure Characteristics of Industrial Radiography Based on Empirical Evidence

  • Cho, Junik;Kim, Euidam;Kwon, Tae-Eun;Chung, Yoonsun
    • Journal of Radiation Protection and Research
    • /
    • v.47 no.2
    • /
    • pp.93-98
    • /
    • 2022
  • Background: This study aims to derive the characteristics of each work type for industrial radiography based on empirical evidence through expert advice and a survey of radiation workers of various types of industrial radiography. Materials and Methods: According to a Korean report, work types of industrial radiography are classified into indoor tests, underground pipe tests, tests in a shielded room (radiographic testing [RT] room test), outdoor field tests, and outdoor large structure tests. For each work type, exposure geometry and radiation sources were mainly identified through the expert advice and workers' survey as reliable empirical evidence. Results and Discussion: The expert advice and survey results were consistent as the proportion of the work types were high in the order of RT room test, outdoor large structure test, underground pipe test, outdoor field test, and indoor test. The outdoor large structure test is the highest exposure risk work type in the industrial radiography. In most types of industrial radiography, radiation workers generally used 192Ir as the main source. In the results of the survey, the portion of sources was high in the order of 192Ir, X-ray generator, 60Co, and 75Se. As the exposure geometry, the antero-posterior geometry is dominant, and the rotational and isotropic geometry should be also considered with the work type. Conclusion: In this study, through expert advice and a survey, the external exposure characteristics for each work type of industrial radiography workers were derived. This information will be used in the reconstruction of organ dose for health effects assessment of Korean radiation workers.

Improvement of Investigation Items of Fatal Industrial Accidents Considering Human Error Characteristics (인적오류를 고려한 중대재해 조사항목의 개선)

  • 이동하;나윤균
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.4
    • /
    • pp.279-285
    • /
    • 1998
  • This study investigated human error characteristics of the 42 fatal industrial accidents reported by staff members of Korea Industrial Safety Corporation. Various types of human error were judged to be primary contributing factors in about 74 percent of the cases. Most of human error made by involved industrial operators resulted from two types of mistakes: (1) mistake in judgement of work situation, and (2) omission in daily check. It was concluded that preparation/observance for work procedure manuals, danger predication training and enforcement/Education of daily check routine would be effective preventive tools for these types of human error attributable to fatal industrial accidents.

  • PDF

Work Domain Analysis Based on Abstraction Hierarchy: Modelling Concept and Principles for Its Application (추상화계층에 기반한 작업영역분석의 모델링 개념 및 적용 원칙)

  • Ham, Dong-Han
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.3
    • /
    • pp.133-141
    • /
    • 2013
  • As a work analysis technique, Work Domain Analysis (WDA) aims to identify the design knowledge structure of a work domain that human operators interact with through human-system interfaces. Abstraction hierarchy (AH) is a multi-level, hierarchical knowledge representation framework for modeling the functional structure of any kinds of systems. Thus, WDA based on AH aims to identify the functional knowledge structure of a work domain. AH has been used in a range of work domains and problems to model their functional knowledge structure and has proven its generality and usefulness. However, many of researchers and system designers have reported that it is never easy to understand the concepts underlying AH and use it effectively for WDA. This would be because WDA is a form of work analysis that is different from other types of work analysis techniques such as task analysis and AH has several unique characteristics that are differentiated from other types of function analysis techniques used in systems engineering. With this issue in mind, this paper introduces the concepts of WDA based on AH and offers a comprehensive list of references. Next, this paper proposes a set of principles for effectively applying AH for work domain analysis, which are developed based on the author's experiences, consultation with experts, and literature reviews.

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Modern Information Technologies in the Organization of Educational Work in Secondary Institutions of Great Britain

  • Shvydenko, Valentyna;Korovii, Daria;Duchenko, Anna;Semenova, Olena;Koval, Valentyna;Lukatska, Yana
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.1
    • /
    • pp.358-366
    • /
    • 2022
  • The article considers current information technologies in the organization of educational work in secondary schools in Great Britain. The forms and types of organization of educational work in secondary schools of Great Britain with the help of modern information technologies are covered. The purposes of education with the help of modern information technologies are singled out. Mental, physical, labor, moral, aesthetic and other types of education, merged in a holistic educational process, provide an opportunity to achieve the main goal - the formation of a comprehensive and harmoniously developed personality. All forms of educational work have their pedagogical significance, and each of them is valuable in the process of education. Democratization and partnership development are the leading principles of education in British schools at the present stage; multiculturalism and student independence. This is the ability to promote the role of different types of education, such as: labor, moral, legal, religious, family, environmental, aesthetic, civic, physical, mental education, which is now possible with the help of current information technology. The article considers current information technologies in the organization of educational work in secondary schools in Great Britain. The forms and types of organization of educational work in secondary schools of Great Britain with the help of modern information technologies are covered. The purposes of education with the help of modern information technologies are singled out. Mental, physical, labor, moral, aesthetic and other types of education, merged in a holistic educational process, provide an opportunity to achieve the main goal - the formation of a comprehensive and harmoniously developed personality. All forms of educational work have their pedagogical significance, and each of them is valuable in the process of education. Democratization and partnership development are the leading principles of education in British schools at the present stage; multiculturalism and student independence. This is the ability to promote the role of different types of education, such as: labor, moral, legal, religious, family, environmental, aesthetic, civic, physical, mental education, which is now possible with the help of current information technology.

Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work (중대재해사례와 직업강도를 고려한 건축공사 위험성 평가)

  • Lee, Jong-Bin;Go, Seong-Seok;Jang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).