• Title/Summary/Keyword: with finite sites

Search Result 72, Processing Time 0.028 seconds

Technology for the Detection of Corrosion Defects in Buried Pipes of Nuclear Power Plants with 3D FEM (3D 유한요소법을 이용한 원전 매설배관 부식결함 탐상기술 개발)

  • Kim, Jae-Won;Lim, Bu-Taek;Park, Heung-Bae;Chang, Hyun-Young
    • Corrosion Science and Technology
    • /
    • v.17 no.6
    • /
    • pp.292-300
    • /
    • 2018
  • The modeling of 3D finite elements based on CAD data has been used to detect sites of corrosion defects in buried pipes. The results generated sophisticated profiles of electrolytic potential and vectors of current distributions on the earth surface. To identify the location of defects in buried pipes, the current distribution on the earth surface was projected to a plane of incidence that was identical to the pipe locations. The locations of minimum electrolytic potential value were found. The results show adequate match between the locations of real and expected defects based on modeling. In addition, the defect size can be calculated by integrating the current density curve. The results show that the defect sizes were $0.74m^2$ and $0.69m^2$, respectively. This technology may represent a breakthrough in the detection of indirect damage in various cases involving multiple defects in size and shape, complex/cross pipe systems, multiple anodes and stray current.

A probabilistic framework for drought forecasting using hidden Markov models aggregated with the RCP8.5 projection

  • Chen, Si;Kwon, Hyun-Han;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.197-197
    • /
    • 2016
  • Forecasting future drought events in a region plays a major role in water management and risk assessment of drought occurrences. The creeping characteristics of drought make it possible to mitigate drought's effects with accurate forecasting models. Drought forecasts are inevitably plagued by uncertainties, making it necessary to derive forecasts in a probabilistic framework. In this study, a new probabilistic scheme is proposed to forecast droughts, in which a discrete-time finite state-space hidden Markov model (HMM) is used aggregated with the Representative Concentration Pathway 8.5 (RCP) precipitation projection (HMM-RCP). The 3-month standardized precipitation index (SPI) is employed to assess the drought severity over the selected five stations in South Kore. A reversible jump Markov chain Monte Carlo algorithm is used for inference on the model parameters which includes several hidden states and the state specific parameters. We perform an RCP precipitation projection transformed SPI (RCP-SPI) weight-corrected post-processing for the HMM-based drought forecasting to derive a probabilistic forecast that considers uncertainties. Results showed that the HMM-RCP forecast mean values, as measured by forecasting skill scores, are much more accurate than those from conventional models and a climatology reference model at various lead times over the study sites. In addition, the probabilistic forecast verification technique, which includes the ranked probability skill score and the relative operating characteristic, is performed on the proposed model to check the performance. It is found that the HMM-RCP provides a probabilistic forecast with satisfactory evaluation for different drought severity categories, even with a long lead time. The overall results indicate that the proposed HMM-RCP shows a powerful skill for probabilistic drought forecasting.

  • PDF

FINITE ELEMENT ANALYSIS OF STRESSES INDUCED BY OSSEOINTEGRATED PROSTHESES WITH OR WITHOUT CONNECT10N BETWEEN NATURAL TOOTH AND OSSEOINTEGRATED ABUTMENTS (골 유착성 임프란트 보철수복시 자연지대치와의 고정유무에 따른 유한요소법적 응력분석)

  • Ko, Heon-Ju;Chung, Chae-Heon
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.29 no.2
    • /
    • pp.147-160
    • /
    • 1991
  • The purpose of this study was to examine, by the method of finite element analysis, how implant geometry with or without connection between natural tooth and osseointegrated abutments affected the stress distribution in surrounding bone and osseointegrated prosthesis. The mandibular first and second molars were removed and the two osseointegrated implants were placed in the first and second molar sites. Stress analysis induced by prostheses with connection(Model A)or without connection(Model B) between natural tooth(second bicuspid) and two osseointegrated abutments(first molar and second molar) was performed under vertical point load(Load P1) or distributed point load(Load P2). The results were as follows; 1. Under vertical point load, mesial tilting was shown in both Model A and Model B and inferior displacement of Model A was greater than that of Model B in the second bicuspid. 2. Under vortical point load, the first and second molars showed mesial tilting in both Model A and Model B, and inferior displacement of them was similar in Model A and Model B and was less than that of the second bicuspid. 3. Under distributed point load, mesial displacement was shown in Model A and Model B and inferior displacement of Model A was less than that of Model B in the second bicuspid. 4. Under distributed point load, mesial tilting was shown and inferior displacement of Model A was similar to that of Model B in the first and second molars. 5. In Model A under vertical point load, high stress was concentrated in the corneal portion of first molar and distributed throughout the second molar and the second bicuspid, and the stress distribution of the second molar was greater than that of the second bicuspid. 6. In Model B under vertical point load, high stress was concentrated in the coronal and mesio-cervical portion of the first molar. 7. In Model A under distributed point load, high stress was concentrated in the mesio-cervical portion of the first molar and evenly distributed throughout the second molar and the second bicuspid. 8. In Model B under distributed point load, high stress was concentrated in the disto-cervical portion of the second bicuspid and evenly distributed throughout the first and second molars.

  • PDF

A Numerical Study on the Prevention of Clogging in Granular Compaction Pile (쇄석다짐말뚝에 발생하는 간극막힘 저감방안에 관한 수치해석적 연구)

  • Jeong, Jaewon;Lee, Seungjun;Park, Nowon;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.1
    • /
    • pp.43-51
    • /
    • 2013
  • Recently, engineering problems such as long-term settlement, differential settlement, and the resultant structural damage, have been frequently reported at construction sites. Use of Sand Compaction Piles(SCP) and Granular Compaction Piles(GCP) are good at remedying existing problems, improving bearing capacity and promoting consolidation. However, such compaction piles have the potential for clogging, which would limit their usability. Investigations into the potential for clogging in SCP, GCP, and GCP mixed with sand has not been thoroughly conducted and is the objective of this current study. Large scale direct shear tests were performed on sections of SCP, GCP, and sand mixed GCP to evaluate bearing capacity. Discrete Element Method analyses were conducted with PFC3D and Finite Element Analyses were conducted with MIDAS GTS to propose an algorithm to help reduce clogging in the granular compaction piles. Results from the large scale direct shear test and multiple simulations suggest a 70% gravel and 30% sand mixing ratio to be optimal for bearing capacity and reducing clogging.

Development of Equations for Static Design Loads of Sphere Type LNG Tank with Cylindrical Extension (원통 확장부를 갖는 구형 LNG 탱크의 정적 설계하중 산출식 개발)

  • Shin, Sang-Hoon;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.8
    • /
    • pp.5060-5066
    • /
    • 2015
  • The number of shop needed for the fabrication of sphere type LNG tank is proportional to that of the tank radius to be constructed. Due to limitation of facility investment including building sites, it is practically difficult to fabricate various size tanks of perfectly spherical shape in the yards. The efficient method to increase cargo tank capacity is to extend vertically the conventional sphere type LNG tank by inserting a cylindrical shell structure. In this study, equations for static design loads are developed for sphere type LNG tank with central extension. The results of this study will be combined with dynamic design loads to build the simplified analysis method which enable the precise initial estimate instead of time consuming finite element analysis.

A Numerical Study on the Reduction Effect of Blasting Vibration with Cut Method (심발공법에 따른 발파진동 저감효과에 대한 수치해석적 연구)

  • Son, Ji-Ho;Kim, Byung-Ryeol;Lee, Seung-Joong;Kim, Nam-Soo;Lee, Hyo;Choi, Sung-Oong
    • Explosives and Blasting
    • /
    • v.37 no.1
    • /
    • pp.1-13
    • /
    • 2019
  • The repeated blasting vibration, which is induced commonly in NATM excavation site, can cause a severe damage to the nearby facilities. It is known that the most effective method for reducing blasting vibration includes the use of electronic detonator, deck charge and change of cut method, and so forth. In order to analyze the effect of blasting vibration reduction, in this study, three-dimensional FDM (Finite Difference Method) program FLAC3D has been used for reflecting the blasting hole, delayed time and charging amount. Also the numerical analysis has been performed by applying a dynamic load to each blasting hole. The cut method has been applied with several methods, such as V-cut and Double-drilled parallel cut, which are common in tunnel construction sites. Also, the field test blasting has been carried out in order to compare the measured data with results of numerical analysis. It was shown that the numerical analysis and the field measurement coincide well.

Effect of Underground Dam for the Prevention of Seawater Intrusion at the Seom-jin River (지하댐 설치 시 섬진강 하류 염수침입 방지 효과의 모델기반 분석)

  • Kim, Sungyun;Kim, Gyoobum;Park, Joonhyeong;Shin, Seonho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.8
    • /
    • pp.51-57
    • /
    • 2011
  • Surface water at the lower part of the Seom-jin river has a high salinity because the erosion at river bottom has made sea water move upstream continuously since 1978. The effect of underground dam on the prevention of sea water intrusion was modelled in this study. Present chloride concentration in surface water decreases exponentially along a river and in groundwater is about one-tenth of surface water's. The finite element method model, FEFLOW, was conducted on the assumption that the underground dam with a height of 25m over a bedrock is located under a water surface at the site of 4.6km from an estuary. The result shows that the position with chloride concentration of 0.25psu moves downstream from the sites of 25km to 22km, if an enough sedimentation with 5m thickness happens in the upper reservoir of underground dam. On the other side, the underground dam is little effective for the prevention of sea water intrusion in case of non-sedimentation.

Characteristics on Pullout Behavior of Belled Tension Pile in Sandy Soils (사질토지반의 선단확장형말뚝의 인발거동 특성)

  • Cho, Seok-Ho;Kim, Hak-Moon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3599-3609
    • /
    • 2010
  • Recently, the construction of coastal structures and high-rise structures against the horizontal and uplift forces increases with the developing the coastal developments. Especially the application of belled tension pile as foundation type to effectively resist uplift force is increasing in coastal structures. However, research on pullout resistance of belled tension pile has been limited and not yet been fully performed. Therefore, the pullout load tests of belled tension piles in four overseas sites were performed, then the bearing capacity, characteristics on load-displacement of piles and load distribution considering skin friction were investigated in this paper. In addition, the limit pullout bearing capacity calculated by the three-dimensional finite element analysis and theoretical methods were compared with values of in-situ test.

Design and Verification of Connected Data Architecture Concept employing DataLake Framework over Abyss Storage Cluster (Abyss Storage Cluster 기반 DataLake Framework의 Connected Data Architecture 개념 설계 및 검증)

  • Cha, ByungRae;Cha, Yun-Seok;Park, Sun;Shin, Byeong-Chun;Kim, JongWon
    • Smart Media Journal
    • /
    • v.7 no.3
    • /
    • pp.57-63
    • /
    • 2018
  • With many types of data generated in the shift of business environment as a result of growth of an organization or enterprise, there is a need to improve the data-processing efficiency in smarter means with a single domain model such as Data Lake. In particular, creating a logical single domain model from physical partitioned multi-site data by the finite resources of nature and shared economy is very important in terms of efficient operation of computing resources. Based on the advantages of the existing Data Lake framework, we define the CDA-Concept (connected data architecture concept) and functions of Data Lake Framework over Abyss Storage for integrating multiple sites in various application domains and managing the data lifecycle. Also, it performs the interface design and validation verification for Interface #2 & #3 of the connected data architecture-concept.

Development of Optimal Chlorination Model and Parameter Studies (최적 염소 소독 모형의 개발 및 파라미터 연구)

  • Kim, Joonhyun;Ahn, Sooyoung;Park, Minwoo
    • Journal of Environmental Impact Assessment
    • /
    • v.29 no.6
    • /
    • pp.403-413
    • /
    • 2020
  • A mathematical model comprised with eight simultaneous quasi-linear partial differential equations was suggested to provide optimal chlorination strategy. Upstream weighted finite element method was employed to construct multidimensional numerical code. The code was verified against measured concentrations in three type of reactors. Boundary conditions and reaction rate were calibrated for the sixteen cases of experimental results to regenerate the measured values. Eight reaction rate coefficients were estimated from the modeling result. The reaction rate coefficients were expressed in terms of pH and temperature. Automatic optimal algorithm was invented to estimate the reaction rate coefficients by minimizing the sum of squares of the numerical errors and combined with the model. In order to minimize the concentration of chlorine and pollutants at the final usage sites, a real-time predictive control system is imperative which can predict the water quality variables from the chlorine disinfection process at the water purification plant to the customer by means of a model and operate the disinfection process according to the influent water quality. This model can be used to build such a system in water treatment plants.