This is a Double-Track Railway tunnel in typical Tae-Gu black and gray shale forming part of the No.1 Line of the Tae-Gu Subway. The main fault zone at tunnel is a moderately to highly weathered and closely jointed zone, 0.5 m wide with associated paralled jointing which is slickensided and fractured. After excavation by blasting, the soft rocks should need to be reinforced with optimal supporting pattern which might be better redesigned through the consideration of the results of in-situ rock measurements at the field. Performances fo the field tests included Point Load Test, Schmidt Hammer Test, and field joint measurement gave the detail data for the optimum support design and safe excavation of the No.1 Line of Tae-Gu Subway at the No.1-7 consturction site adn the safety of this redesigned supports system was analysed by the FDM program FLAC.
Chung Mun Kyu;Chung Hyeng Hwan;An Byung Chul;Wang Yong Peel
Journal of Advanced Marine Engineering and Technology
/
v.29
no.2
/
pp.225-235
/
2005
In this Paper, it was designed the GA-fuzzy controller of a Thyristor Controlled Series Capacitor(TCSC) for enhancement of power system stability. The newly designed controller of TCSC was designed to overcome the nonlinearity such as operating point change of power system as well as to respond to disturbances as uncertainties of line parameters and line fault. So, fuzzy controller by intelligent control theory was used for it. And the fuzzy controller was optimized from a genetic algorithm for complements the demerit such as the difficulty of the component selection of fuzzy controller namely. scaling factor. membership function and control rules. Nonlinear simulation results show that the proposed control technique is superior to conventional PSS in dynamic responses over the wide range of operating conditions and is convinced robustness and reliableness in view of structure.
Journal of Electrical Engineering and information Science
/
v.1
no.1
/
pp.118-128
/
1996
In safety critical hard real-time systems, a timing fault may yield catastrophic results. In order to eliminate the timing faults from the fast responsive real-time control systems, it is necessary to schedule a code based on high precision timing analysis. Further, the schedulability enhancement by having multiple processors is of wide spread interest. However, although an instruction level parallel processing is quite effective to improve the schedulability of such a system, none of the real-time applications employ instruction level parallel scheduling techniques because most of the real-time scheduling models have not been designed for fine-grain execution. In this paper, we present a timing constraint model specifying high precision timing constraints, and a practical approach for constructing static schedules for a VLIW execution model. The new model and analysis can guarantee timing accuracy to within a single machine clock cycle.
The discontinuity of rock is one of important elements that have impact on the dynamic movement of rock. A slope made of gneiss has complicated geological structure because of the gneiss forming process through metamorphism covering wide range and the anisotropic structure with foliation. In this study, before cutting slope, the rock of slope had been found as a good quality by the boring test. But during construction tension cracks had occurred in the section with 170m length during large-scale excavation work with depth more than 20m. Ground surface geological investigation, boring exploration, resistivity logging and borehole image processing had been done to find the causes of the tension crack. It was possible to estimate the scale of fault existing in large area through resistivity logging and geological investigation. Large scale slickenside and fault clay had been found as the result of comprehensive analysis.
Kim, Jong-Uk;Kim, Kyung-Chul;Shin, Pan-Seok;Choi, Jong-Ki;Choi, Sun-Kyu;Kim, Dong-Myung
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.2
/
pp.133-141
/
2010
Grounding system insures a reference potential point for electric devices and also provides a low impedance path for fault currents in the earth. The ground impedance as function of frequency is necessary for determining its performance since fault currents could contain a wide range of frequencies. Copper and concrete rod electrodes are the most commonly used grounding electrode in electric distribution systems. In this paper, the ground impedance of copper and concrete rods has been measured by frequency and time domain characteristic tests. An equivalent transfer function model of the ground impedance is identified from the measured values by using ARMA method and evaluated by comparing conventional grounding impedances.
Kim, Kyung-Chul;Kim, Jong-Uk;Lee, Kyu-Jin;Choi, Jong-Ki;Choi, Sun-Kyu;Kim, Dong-Myung
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.24
no.2
/
pp.9-15
/
2010
Grounding insures a reference potential point for electric devices and also provides a law resistance path for fault or transient currents in the earth. The grounding impedance as a function of frequency is necessary for determining its performance since fault or transient currents could contain a wide range of frequencies. A concrete rod electrode is one of the commonly used grounding electrodes in electric distribution systems. In this paper, the grounding impedance of concrete rods has been measured in frequency raging from 60[Hz] up to 100[kHz] and an equivalent model of the grounding impedance is identified from the measured values. The grounding impedance under study when a typical lightning surge is injected into the grounding system was simulated numerically and graphically through the use of the EDSA software program.
Kim, Kyung-Chul;Oh, Kyung-Hoon;Kim, Min-Sung;Choi, Jong-Kee;Kim, Dong-Myung
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.23
no.8
/
pp.26-32
/
2009
Grounding insures a reference potential point for electric devices and also provides a law resistance path for fault or transient currents in the earth. The ground impedance as a function of frequency is necessary for determining its performance since fault or transient currents could contain a wide range of frequencies. A copper rod electrode is the most commonly used grounding electrode in electric distribution systems. In this paper, the grounding impedance of copper rods has been measured in frequency raging from 60[Hz] up to 100 [kHz] and an equivalent model of the grounding impedance is identified from the measured values. The grounding impedance under study when a typical lightning surge is injected into the grounding system was simulated numerically and graphically through the use of the EDSA software program.
Computer are being used in an increasingly wide variety of application areas, and their correct operation is often critical for business success and humasn safety. Developing high quality software products is therefore of prime important. The recent game software become popular, so we are interest in the game software testing. According to the kinds of game software, because it has the different characters, so game software testing is very difficult. According to enviroment change, Recently, online game is popular, so online game trade in the world market. In the company, developers try to develop the reliable game software. But we can experience many fault of game software in spite of the beta testing. Especially, Testing is very difficult on the game software because of various environment and functionality. We tried the survey for game user. In this paper, we study the quality testing metric of game software fault basis on the ISO/IEC 9126. Also, we consist of the check list of game software a point of view user. It apply for the reliability testing metrics of ISO/IEC 9126.
Ground systems flow fault currents into the ground, and suppress Ground Potential Rise (GPR) by the current. In this paper, we designed and fabricated a surge impedance meter to analyze the ground impedance in wide frequency ranges. The meter consists of a surge generator, a high speed sample/hold (S/H) circuit and an associated electronics. The surge generator produces surge voltage up to 5kV in ranges of $50\sim500ns$. Field tests were carried out to evaluate the surge impedance meter at a driven-rod ground system. The results showed that surge impedance of ground systems should be measured by various fast surge waveforms, since the impedance increases as the rise time of applied voltage increases.
In order to overcome the difficulties of quantitative risk analysis such as complexity of model, we propose a systematic methodology for risk quantification of railway system which consists of 6 steps: The identification of risk factors, the determination of major scenarios for each risk factor by using event tree, the development of supplementary fault trees for evaluating branch probabilities, the evaluation of event probabilities, the quantification of risk, and the analysis in consideration of accident situation. In this study, in order to address the feasibility of the propose methodology, this framework is applied to the prototype risk model of nation-wide railway level crossings. And the quantification result based on the data of 2005 in Korea will also be presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.