• 제목/요약/키워드: water inflow

검색결과 1,477건 처리시간 0.034초

파쇄대를 통과하는 해저터널의 수리거동에 관한 연구 (Hydraulic behavior of a subsea tunnel in a ground with fractured-zones)

  • 신종호;최규철
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1571-1580
    • /
    • 2008
  • Subsea tunnels that link land to island and among nations for transportation, efficient development of limited surface and pursuit of economic development should be designed to support pore water pressure on the lining. It is generally constructed in the bed rock of the sea bottom. When the tunnel excavation face meets fractured-zones below sea bottom, collapse may occur due to an increase of pore water pressure and large inflow. Such an example can be found in the Norwegian subsea tunnel experiences in 1980's. In this study hydraulic behavior of tunnel heading is investigated using numerical method based on the collapse of Norwegian subsea tunnel. The effect of pore water pressure and inflow rate were mainly concerned. Horse-shoe shaped model tunnel which has 50 m depth from the sea bottom is considered. To evaluate hydraulic performance, parametric study was carried out for varying relative permeability. It is revealed that pore water pressure has increased with an increase of sea depth. Especially, at the fractured-zone, pore water pressure on the lining has increased significantly. Inflow rate into tunnel has also increased correspondingly with an increase in sea depth. S-shaped characteristic relation between relative permeability and normalized pore water pressure was obtained.

  • PDF

건기와 우기시 낙동강 유역 분류식 하수관거의 유입수/침입수의 분석 (Analysis of Infiltration/Inflow at Dry and Rainfall Periods in Separated Sewer System of Nakdong River Basin)

  • 구정은;이홍신;손건태;이성억;이승환
    • 상하수도학회지
    • /
    • 제25권1호
    • /
    • pp.75-84
    • /
    • 2011
  • This study was conducted to provide a basic information for the establishment of operation and treatment processes in sewer system of Nakdong river basin to minimize the overall pollutants loading to water body. Sewage flowrates were regularly measured and monitored at various sampling points of newly-built separated sewer system located in G City GA sites. To assess the inflow sewage flowrate, various calculating methods such as water-use evaluation, average-minimum daily flow quality evaluation, minimum daily flow evaluation, night water-use evaluation were used. Average I/Is were calculated except water-use evaluation. Average I/Is were found to be 6.5 $m^{3}/d$, 3.5 $m^{3}/d$, 7.7 $m^{3}/d$ at GA-1, GA-2, GA-3 points respectively. I/I ratios of three areas were found to be 4.8 %, 2.0 % and 2.7 % respectively and were obviously lower than those of the other separated sewer systems as shown in the previous studies.

직상류 계측유량경계조건과 분포형모델을 이용한 대규모 다목적댐 홍수유입량 산정 (Flood Inflow Estimation at Large Multipurpose Dam using Distributed Model with Measured Flow Boundary Condition at Direct Upstream Channels)

  • 홍석현;강부식
    • 대한토목학회논문집
    • /
    • 제35권5호
    • /
    • pp.1039-1049
    • /
    • 2015
  • 대규모 다목적댐 지점의 유입량 산정은 수위-저수용량곡선에 댐 축에서 측정된 수위를 적용하여 시간당 저수량변화를 계산한 후 방류량을 감안하여 산정하고 있으나, 이 방법은 태풍 등 대규모 홍수 시에는 급격한 유입량 증가로 인한 배수위 및 강한 바람 등의 영향으로 저수지내의 수위가 균일하지 않아 유입량 산정 시 오차 원인이 되고 있다. 이 외에 기존 수위-저수용량 곡선 방법에 의한 유입량 계산 시 문제점인 댐건설 이후 유입 퇴사로 인한 저수용량의 변화, 댐 지점에서의 수위관측의 불균일성 등 다양한 불확실성이 존재하므로 이에 대한 오차 규명이 반드시 필요하다. 본 연구에서는 저수지 유입량 분석시 분포형 강우유출모형을 이용한 UBC-3P 기법을 적용하여 모형의 모의능력을 평가하였다. 최종적으로 기존 유역내 유입량 관측치와 비교한 결과 Peak유량과 Total유량에서 결정계수가 0.82~0.99 사이값을 나타내므로 댐 지점에서의 모형의 적합성을 확인하였다.

선택취수설비 굴착시 지하수 유입 방지를 위한 그라우팅 효과의 모델링 예측 및 평가 (Forecasting and Assessment of the Grouting Effect, using a Numerical Model, to Prevent Groundwater Inflow during Excavation of a Vertical Shaft for a Selective Intake Structure)

  • 김규범;김완수;박정훈;손영철;김진우
    • 지질공학
    • /
    • 제23권3호
    • /
    • pp.227-234
    • /
    • 2013
  • 대규모 저수지에서 상수원 선택취수설비의 수직구 굴착시 저수지 및 주변 지층으로부터의 지하수 유입이 발생할 수 있어 그라우팅을 통한 차수가 요구된다. 본 연구에서는 소양강댐 우안의 선택취수설비 공사 중에 발생할 수 있는 지하수 유입량을 그라우팅 실시 여부에 따라 모사하고 시공 중의 실제 유입량과 비교하였다. 수직구에 그라우팅이 시공되지 않은 경우에는 445~754 $m^3/d$, 그라우팅이 시공된 경우에는 58~96 $m^3/d$의 지하수가 수직구내로 유입되는 것으로 예상되었으며, 실제 그라우팅을 거친 후 굴착 과정에서 배출된 지하수량을 측정한 결과 30~100 $m^3/d$의 범위를 보여 예측 수량과 유사한 것으로 나타났다. 수직구의 작업 안정성 확보 및 원활한 공정을 위해서는 수치모델을 활용한 그라우팅 효과의 사전 평가가 필요하며 이를 근거로 그라우팅 시공을 선행한 후 굴착이 진행되는 것이 필요하다.

Design of an Intelligent Controller for Waste Water Heat Pump Recycled Energy Systems

  • Choo, Yeon-Gyu
    • Journal of information and communication convergence engineering
    • /
    • 제9권4호
    • /
    • pp.375-378
    • /
    • 2011
  • This study is intended to realize an intelligent controller using fuzzy control algorithms in order to recycle energy by recycling the waste water heat discharged by waste water heat collection boilers. Using waste water inflow temperature changes and waste water inflow amount changes as parameters, we present characteristic curves of the number of compressors being operated at fixed speeds and the temperature of hot water being discharged. We propose an intelligent controller that determines the optimum number of compressors being operated at fixed speeds in real time by measuring changes in the temperature and amount of waste water inflows in order to minimize the number of compressors being operated at fixed speeds relative to the waste water load flowing into the waste water heat collection boiler.

단지계획지구 홍수저류지의 하천유지유량 공급방안 연구 (A Feasibility Study on Supplying Stream Minimum Flow Using Detention Storage in Developing Planned District)

  • 노재경;박현구
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2005년도 학술발표회 논문집
    • /
    • pp.1219-1223
    • /
    • 2005
  • This study was accomplished to confirm the possibility of supplying stream minimum flow from detention storage which was determined to reduce peak flows of flood within developing planned district. The results analyzed was summarized as follows; Firstly, Sin-gil district situated in Ansan city was selected, of which watershed area has $0.56km^2$. And detention storage was determined to $5,370m^3$ from analyzing flood volume by the SCS unit hydrograph method. Secondly, using Visual Basic ver 6.0, a detention storage water balance model was developed, in which simulation was based on conditioning storage inflow and outflow according to streamflow volume or rate state. And streamflow was simulated using the DAWAST model. Thirdly, detention operation scenarios were consisted of the combinations with inflow referencing streamflow of 5mm/day, 10mm/day and outflow referencing streamflow of 1mm/day, 2mm/day. The developed detention storage water balance model was operated to simulate daily water storages of detention sized on flood by scenarios. Stream minimum flows were able to be supplied during 209 days to 237 days per a year, total volume of stream minimum flows supplied for this period was analyzed to reach 27 to $55\% of yearly streamflow volume. If inflow criteria of streamflows to detention was considered to be established on a theoretical condition, it is expected to supply stream minimum flows of 20 to $30\% of yearly streamflow from stream to detention. Also to maximize function of supplying urban stream minimum flow from detention storages, sewage waters within developing planned district have to be treated and entered to detention inflow together with streamflows to enrich function of detention planned to reduce flood volumes.

  • PDF

누가차분법을 통한 가뭄 빈도유입량 산정에 관한 이론적 고찰 (Theoretical analysis of quantification of drought frequency inflow series via K-water cumulative difference method)

  • 김지흔;이재황;김영오
    • 한국수자원학회논문집
    • /
    • 제55권9호
    • /
    • pp.701-705
    • /
    • 2022
  • 이상기후로 가뭄이 빈번해짐에 따라 수자원 시설의 가뭄대응력 산정에 대한 필요성이 커지고 있다. 이를 위해서는 신뢰할 수 있는 갈수빈도 유입량 추정 연구가 선행되어야 한다. 본 연구는 기존 K-water의 가뭄 빈도유입량 추정방법인 누가차분법의 세 가지 한계, 즉 음의 값과 역전현상, 그리고 평년 이상으로 과대 산정되는 문제의 발생조건에 대해 각각 2변수 log-normal 분포와 Gumbel 분포를 적용하여 이론적 고찰을 실시하였다. 그 결과, 음의 값은 누가 과정에서 scale parameter보다 location parameter의 변화가 커지는 경우 발생함을 확인하였고, 역전현상 및 평년보다 큰 가뭄유입량은 누가 과정에서 표준편차가 감소하는 경우 발생하는 것으로 분석되었다.

재정사업과 민간투자사업의 하수처리장 하수유입률 특성분석 (Comparing the Inflow Rate of Sewage Treatment Plants Invested by the Public Funds or Public-Private Partnership (PPP) Projects)

  • 이원석;조은주;손영규;김지형
    • 한국물환경학회지
    • /
    • 제25권5호
    • /
    • pp.778-784
    • /
    • 2009
  • The purpose of this study is to figure out the differences of the inflow rates of Sewage Treatment Plants (STP), invested by public fund or public-private partnership (PPP). This paper finds that the average ratio of sewage inflow according to facility capacities (medium and small scale STP) was either nearly below 30% or above 100% in the first year. As the size of STP increased, there was decrease in the accuracy of demand assumption. This was because the operation time when the ratio of sewage inflow was uniform was different according to the size of STP, whereby the time was short when the STP were small. The design average ratio of sewage inflow was 10% larger than the real average ratio; this was considered overdesigned. In the case of a plant built by the PPP scheme, the average ratio of inflow of the STP before an abolition of MRG was larger than after the abolition of MRG. This may be explained by moral hazard from too much reliance on MRG. After the abolition of MRG, the demand risk of PPP was shifted from a PPP project to a conventional project.

Attention 기법을 적용한 LSTM-s2s 모델 기반 댐유입량 예측 연구 (Prediction of dam inflow based on LSTM-s2s model using luong attention)

  • 이종혁;최수연;김연주
    • 한국수자원학회논문집
    • /
    • 제55권7호
    • /
    • pp.495-504
    • /
    • 2022
  • 최근 인공지능의 발전으로 시계열 자료 분석에 효과적인 Long Short-Term Memory (LSTM) 모델이 댐유입량 예측의 정확도를 높이는 데 활용되고 있다. 본 연구에서는 그 중 LSTM의 성능을 더욱 향상할 수 있는 Sequence-to-Sequence (s2s) 구조에 Attention 기법을 LSTM 모델에 첨가하여 소양강댐 유역의 유입량을 예측하였다. 분석 데이터는 2013년부터 2020년까지의 유입량 시자료와 종관기상관측기온 및 강수량 자료를 학습, 검증, 평가로 나누어 훈련한 후, 모델의 성능 평가를 진행하였다. 분석 결과, LSTM-s2s 모델보다 attention까지 첨가한 모델이 일반적으로 더 좋은 성능을 보였으며, attention 첨가 모델이 첨두값도 더 잘 예측하는 모습을 보였다. 그리고 두 모델 모두 첨두값 발생 동안 유량 패턴을 잘 반영하였지만 세밀한 시간 단위 변화량에는 어려움이 있었다. 이를 통해 시간 단위 예측의 어려움에도 불구하고, LSTM-s2s에 attention까지 첨가한 모델이 기존 LSTM-s2s의 예측 성능을 향상할 수 있음을 알 수 있었다.

하구둑의 일 물수지 모형 개발 (Development of Model for Simulating Daily Water Storage in Estuary Barrage Dam)

  • 노재경;이향식;진용신
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2003년도 학술발표논문집
    • /
    • pp.495-498
    • /
    • 2003
  • In order to analyze water supply capacity in estuary barrage dam, a system was developed in which base model was consisted of daily water balance model and daily inflow model. Agricultural water demand to paddy fields and domestic and industrial water demand were considered in this daily water balance model. Also outflow volume through sluice gate and inside water level at time to start outflow was conditioned initially to simulate reservoir storage. The DAWAST model was selected to simulate daily reservoir inflow in which return flows from agricultural, domestic and industrial water were included to simulate runoff. Using this developed system, water supply capacity in the Keum river estuary reservoir was analyzed.

  • PDF