• Title/Summary/Keyword: warranty

Search Result 323, Processing Time 0.021 seconds

Parametric Estimation of a Renewal Function

  • Jeong, Hai-Sung;Na, Myung-Hwan
    • International Journal of Reliability and Applications
    • /
    • v.1 no.1
    • /
    • pp.81-87
    • /
    • 2000
  • One of the most important quantities in reliability theory is the expected number of renewals of a system during a given interval. This quantity, the renewal function, is used to determine the optimal preventive maintenance policy and to estimate the cost of a warranty. In this paper we study a parametric approach for a renewal function. The simulation study is presented to compare the relative performance of the introduced estimators of a renewal function. And we show that the proposed parametric estimator performs well.

  • PDF

Collaborative Product Development (실시간 협업 분산 설계)

  • 임현욱
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.577-590
    • /
    • 2001
  • Designing Seal Windows System ㆍReduced (by a factor of at least 10) the time for evaluating each design alternative ㆍIncreased quality by 20% (measured as the number of errors that are caught before they propagate) ㆍFound and corrected errors prior to production with an estimated $1-2 million in annual savings in warranty costs ㆍCaptured the state of a design, particularly the parameters that were used to make decisions ㆍEliminated geographic and temporal obstacles ㆍDecreased wasted time caused by slow communication paths(omitted)

  • PDF

OPTIMAL SOFTWARE RELEASE POLICY BASED ON WARRANTY AND RISK COSTS

  • 이종형;장규범;박동호
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2004.07a
    • /
    • pp.207-210
    • /
    • 2004
  • 컴퓨터 소프트웨어는 이제 우리의 일상적인 삶에서 필수불가결한 요소이며 시스템의 운용에 중요한 요인이 되었다. 최근에 들어서는 소프트웨어 비용이 하드웨어 비용을 초과하게 되면서 소프트웨어를 개발하는데 필요한 비용과 더불어 소프트웨어 고장에 의한 비용의 중요성이 더 커지게 되었다. 본 논문에서는 Non-Homogeneous Poisson Process(NHPP)에 기초한 소프트웨어 비용 모형을 제안하려고 한다. 개발초기단계에서 출시 전까지의 소프트웨어 개발비용과 테스트비용, 출시이후의 보증기간동안의 제반비용, 소프트웨어 고장에 의한 위험비용 등을 포함하는 소프트웨어 비용 모형을 제안하고 소프트웨어의 최적 출시시기를 결정하는 효과적인 정책을 제시하려고 한다.

  • PDF

Various kinds of data and reliability assessment (여러 가지 데이터와 신뢰성 평가)

  • Baik, Jai-Wook
    • Journal of Applied Reliability
    • /
    • v.9 no.4
    • /
    • pp.303-317
    • /
    • 2009
  • There are a lot of different data in a company. Some of the data can be modified to produce valuable information on reliability. In this study different types of data that can be obtained in a company are reviewed. Reliability related data that can be taken throughout the life cycle of a product are also reviewed. Developing a method of gathering all of the pertinent data from the various sources and databases and pulling them into one central location is explained.

  • PDF

Seatbelt alarm lamp lam-function improvement: Red-X a case application (시트벨트 경고등 점등불량 개선: Red-X 적용사례)

  • Moon, Chan-Oh;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.6
    • /
    • pp.171-179
    • /
    • 2007
  • The objective of this GM Red-X project was to reduce customer complaints on Kalos, Lacetti, Magnus as reported through 2004.1 - 2005.1 warranty performance. Seatbelt alarm lamp mal-function problem is connected with safety. So it is critical issue. Seatbelt alarm lamp mal-function which caused by buckle occurred 22 cases from 2004.1 to 2005.1.

New Warranty Model with Varying Usage Intensity

  • Kim, Che-Soong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.3
    • /
    • pp.142-148
    • /
    • 2005
  • 대부분의 일차원 보증정책에 대한 비용분석은 소비자 사용률이 모든 사용자들에게 동이란 것으로 가정하고 있다. 하지만 현실적으로 사용률은 소비자에 따라서 다르기 때문에, 일반적인 경우 소비자 집단을 ${\kappa}$ 범주로 나눌 수 있다. 즉, 동일한 제품에 대해서 생산자는 ${\kappa}$ 범주에 속하는 다른 보증정책을 제시할 수 있고, 보증비용은 이런 옵션들 가운데 소비자가 자기의 입장에 맞는 보증기간을 선택할 수 있다. 본 논문에서는 소비자의 사용률이 변화하는 경우를 고려한 무료보증정책을 갖는 기대보증비용 모형을 분석하고, 이에 따른 수치예제를 제시한다.

Study on the Application of FRACAS System for Rolling Stock (철도차량 FRACAS System 적용에 관한 연구)

  • Oh, Ji-Eun;Kang, Chan-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.487-497
    • /
    • 2008
  • This paper addresses the Fault Monitoring System developed by Hyundai-Rotem based on the Mil-HDBK-2155 Failure Reporting, Analysis and Corrective Action System. The purpose of a FRACAS is to provide a documented history of any problems, failures, their associated corrective actions as well as detailing how and why each problem arose or failure occurred during the Warranty Period for Rolling Stock delivered by Hyundai-Rotem. The Fault Monitoring System can assess the reliability, availability and maintainability as well as can predict no. of failure at a time which can input to Life Cycle Cost.

  • PDF

A Study on the Liability of the Builder in the Shipbuilding Contract and Products Liability (선박건조자의 책임과 제조물책임에 관한 연구)

  • Jeong, Seon-Cheol
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.2
    • /
    • pp.21-26
    • /
    • 2006
  • A contract for shipbuilding is usually a complicated process and involves a statement of rights, and obligations and responsibilities to which each party agrees vis-a vis the other. Most countries are now well settled with regard to liability of a manufacturer in tort for physical injury and on the other hand, for pure economic loss to remote owners of chattels. Where there is a breach of either contractual warranty or an implied warranty, there may be admiralty jurisdiction, depending once again on the situs of the event and its relationship to traditional maritime activity. First of all, this thesis deals with the contents of contract under English Law. Secondly, this thesis analyse ' s the liability of shipbuilders in Products Liability under English, United States, German and korean Law comparisons. In conclusion, the author gives some suggestions as countermeasures to Products Liability for the shipbuilders in Korea.

  • PDF

A Study on the Conformity of the Goods under International Sale (국제물품매매에서 물품의 계약적합성에 관한 연구)

  • OH, Hyon-Sok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.66
    • /
    • pp.25-46
    • /
    • 2015
  • The purpose of this paper is to provide a legal implication about conformity of goods in the international commercial transactions. There are so many legal relationship after the formation of contract. The most of important thing among the obligations of seller is to provide conformal goods which are of quantity, quality and description required by the contract and which are contained or packaged in the manner required by the contract. If seller violate above duties, seller take the warranty liability. However, CISG describe the conformity of the goods instead of the warranty as follows. First, CISG Art.35(1) states standards for determining whether goods delivered by the seller conform to the contract and Art.35(2) describes standards relating to the goods' quality, function and packaging that, while not mandatory, are presumed to be a part of sales contracts. Article 35(2) is comprised of four subparts. Two of the subparts (article 35(2) (a) and article 35(2)(d)) apply to all contracts unless the parties have agreed otherwise. Second, CISG Art.36 and 38 deals with the time at which a lack of conformity in the goods must have arisen in order for the seller to be liable for it. If seller lack of conformity becomes apparent only after that time, seller is liable for a lack of conformity existing when risk passed to the buyer. Third, CISG Art.49 describe that a buyer who claims that delivered goods do not conform to the contract has an obligation to give the seller notice of the lack of conformity. The most of important things about CISG articles and precedents is that buyer is aware of the lack of conformity and notice it to seller. Failure to satisfy the notice requirements of article 39 eliminates a buyer's defence, based on a lack of conformity in delivered goods, to a seller's claim for payment of the price. Consequently, parties of contract had better agree to the notifying times about lack of conformity. Also, If seller fined the non-conformity, seller has to notify this circumstance to the buyer within short period or agreed time.

  • PDF

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.