• Title/Summary/Keyword: underground wall barrier

Search Result 10, Processing Time 0.025 seconds

Experimental Study on Freezing Soil Barrier Wall for Contaminant Transfer Interception (오염물질 이동 차단을 위한 동결차수벽 형성에 관한 실험적 연구)

  • Shin, Eun-Chul;Kim, Jin-Soo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.10 no.2
    • /
    • pp.29-34
    • /
    • 2011
  • The purpose of this study was to prevent spreading of contaminants from movement of underground water by creating a barrier using artificial freezing method on a soil contaminated by oils and various DNAPLs. Specimens with 80% and 90% degrees of saturation were prepared to form freezing barrier using artificial freezing method. As the results of freezing specimen within soil bin with artificial ground freezing system, artificial contaminated soil cut off wall formed the thinnest wall after 12 hours. It is judged that this cut off wall will control the second soil pollution by intercepting expansion and movement of pollutants and DNAPLs within artificial contaminated soil cut off wall by underground water, intercepting inflow or outflow of underground water. Cut off walls formed by artificial ground freezing system had each other freezing speed according to degree of saturation.

Centrifuge Simulation of Wave Propagation and Isolation Method (환경진동의 지반내 전파특성과 차단에 관한 원심모형실험)

  • Lee, Kang-Il;Kusakabe, O.;Kim, Chan-Kee;Kim, Tae-Hoon;Sul, Jin-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.738-745
    • /
    • 2004
  • There are a number of ways to reduce the ground vibrations, one of which is by installing underground walls. Model tests for ground vibration have been conducted in recent years, but limited attention has been paid to underground wall which can reduce high vibrations. Up to date, only barriers have been actually installed in dry sand because of many unknown factors subsisting on the behavior of the ground. The characteristics of vibration sources, ground conditions and wall barriers have not been well understood yet, therefore centrifugal modeling was adopted to examine all these characteristics. This paper describes a ball dropping system, which can generate a pulse wave propagation through soil mass, and the test results show the effectiveness of underground wall barrier in reducing mechanical vibration.

  • PDF

The Method of Certificating Waterproof Effect for Consecutive Column-Wall Mass in Underground (주열식 지중연속벽체의 차수효과 확인 방안)

  • Koh, Yong-IL
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.9
    • /
    • pp.5-9
    • /
    • 2017
  • On the flow of groundwater, the effect of consecutive column-wall in underground as a hydraulic barrier could be identified by conventional geotechnical methods ((1)visualiy identification of wall mass after underground excavating, (2)uniaxial compressive strength test for core of wall mass in underground, (3)in-situ permeability test in the hole after coring wall mass). However, for the cut off the leakage or infiltration of very high concentrated leachate from the waste landfill or the contaminated groundwater, the waterproof effect of consecutive column-wall in underground should be verified more objectively, by in-situ measuring of pH, temperature and salinity. and by evaluating of their consistency and similarity throughout analyzing the characteristics of basic components and their profiles through the series of chemical experiments. Furthermore, its waterproof effect could be verified additionally throughout deciding the similarity more simply by comparing the general distribution patterns including the difference of high and low peaks from the chromatograms using GC-MS for surrounding groundwater.

A Study on the Mining Method for Limestone Mines with Less Environmental Hazards (환경오염 저감을 위한 석회석 광산개발방안에 대한 연구)

  • 임한욱;김재동;백환조
    • Tunnel and Underground Space
    • /
    • v.10 no.1
    • /
    • pp.80-91
    • /
    • 2000
  • Open cut mining of limestone is generally considered to be more advantageous than underground mining in recovery, grade control, economics, and safety, but it causes substantial environmental pollutants such as ground vibration, noise, dust. It also changes ground surface and may destroy vegetation. The Halla limestone mine which lies adjacent to Baikdu mountains range is selected for a model study. To reduce environmental hazards, and to conserve original surface and woods, both open cut and underground mining methods must be adopted. In case of sub-level sloping. a unit block of 87m high, 70m wide, and 100∼l20m long is suggested with an estimated overall recovery of 42%. Some suggestions to reduce the environmental hazards are also included. The followings must be considered in determining the degree of fragmentation; the discontinuity conditions in the rock mass and the charge concentration both at the bottom and column of the hole. In addition to adopting a barrier wall for reducing environmental hazards, the probable production from underground mining is also discussed.

  • PDF

Performance of Soil-Bentonite Cutoff Wall considering Defects and Formation of Bentonite Cake

  • Nguyen, The Bao;Lee, Chul-Ho;Lim, Jee-Hee;Jeoung, Jae-Hyeung;Choi, Hang-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1264-1273
    • /
    • 2010
  • Soil-bentonite cutoff walls are widely recognized to be the effective barrier for containment of wastes and groundwater. Bentonite cake is usually found remaining on the trench surface due to the use of bentonite slurry during the excavation for the cutoff wall construction. Defects also inevitably take place due to the inappropriate construction procedures or improperly mixed soil-bentonite backfill. The defects include insufficient keys and windows in the soilbentonite cutoff wall. In this study, the performance of the soil-bentonite cutoff wall is evaluated based on the flow rates through the wall. Three-dimensional numerical models were applied to simulate the groundwater flow through the soil-bentonite cutoff walls of typical geometries with consideration of the defects and bentonite cake. Results of the simulations showed that the bentonite cake has no effect in the insufficient key cases. In the keyed wall cases, the bentonite cake with very low hydraulic conductivity significantly impedes the flow of groundwater through the wall. The presence of the bentonite cake not only compromises the window defect but also renders the wall construction more effective in blocking the groundwater flow. These findings show the significance of the bentonite cake in a soil-bentonite cutoff wall construction.

  • PDF

A Study on the Grouting Using a Anti-Swelling of mud stone (미고결된 이암층의 Swelling 방지 그라우팅에 대한 연구)

  • Chun, Byung-Sik;Jung, Kyoung-Sik;Do, Jong-Nam;Lee, Jung-Jae;Kim, Chang-Geun;Kim, Jong-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1204-1209
    • /
    • 2006
  • Grouting operate to reinforce expanded clay ground. Cement grouting is one of the most frequently used techniques for underground construction. This work is going to use to add an electrolytic ion to boring water for expanded reduction. To construct underground structures on expanded clay ground is operated pre-grouting that it is the barrier wall previous excavation to prevent an accident. Grouting for early compressive strength development is made a type of suspension. That grouting aims to prevent the swelling magnification in length of time. From now on, grouting is became a type of higher strength suspension to develop early compressive strength.

  • PDF

Determination of plastic concrete behavior at different strain rates to determine Cowper-Symonds constant for numerical modeling

  • Nateghi, Reza;Goshtasbi, Kamran;Nejati, Hamid Reza
    • Computers and Concrete
    • /
    • v.26 no.3
    • /
    • pp.227-237
    • /
    • 2020
  • Strain rate investigations are needed to calibrate strain-rate-dependent material models and numerical codes. An appropriate material model, which considers the rate effects, need to be used for proper numerical modeling. The plastic concrete cut-off wall is a special underground structure that acts as a barrier to stop or reduce the groundwater flow. These structures might be subjected to different dynamic loads, especially earthquake. Deformability of a structure subjected to dynamic loads is a principal issue which need to be undertaken during the design phase of these structures. The characterization of plastic concrete behavior under different strain rates is essential for proper designing of cut-off walls subjected to dynamic loads. The Cowper-Symonds model, as one of the most commonly applied material models, complies well with the behavior of a plastic concretes in low to moderate strain rates and will be useful in explicit dynamics simulations. This paper aims to present the results of an experimental study on mechanical responses of one of the most useful types of plastic concrete and Cowper-Symonds constant determination procedures in a wide range of strain rate from 0.0005 to 107 (1/s). For this purpose, SHPB, uniaxial, and triaxial compression tests were done on plastic concrete samples. Based on the results of quasi-static and dynamic tests, the dynamic increase factors (DIF) of this material in different strain rates and stress state conditions were determined for calibration of the Cowper - Symonds material models.

Characteristic of Permeability with the Sand, Calcium Bentonite and Solidifier Mixtures according to Selective Reaction of TCE (트리클로로에틸렌(TCE) 선택적 반응에 따른 모래, 칼슘-벤토나이트 및 겔화제 혼합차수물의 투수 특성)

  • Yun, Seong Yeol;Choi, Jeong Woo;Oh, Minah;Lee, Jai-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.1
    • /
    • pp.25-33
    • /
    • 2020
  • To improvement the swelling characteristics of the existing cutoff wall against the moisture, the permeability of the sand, calcium bentonite and solidifier mixture according to the contact with trichloroethylene (TCE) was evaluated. Characteristics analysis and the permeability test of the research materials were performed. The permeability was decreased as the mixing ratio of the calcium bentonite was increased and it was increased as the mixing ratio of the solidifier was increased. In conclusion, when mixing 15% of calcium bentonite and more than 30% of solidifier, the permeability coefficient in the underground water movement was analyzed as more than α × 10-4 cm/sec showing that it does not block the underground water movement. In addition, as the permeability coefficient of mixtures after TCE reaction was analyzed as less than α ×10-7 cm/sec, it satisfied the condition of blocking layer (less than 1.0 × 10-6 cm/sec). Therefore, the calcium bentonite and solidifier can be utilized as barrier that showing the characteristic of percolation ability conversion in soil and underground water contaminated with TCE.

Improvement of existing drainage system for leakage treatment in exiting underground structures (운영중인 지하구조물의 누수처리를 위한 유도배수공법의 개선)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.669-683
    • /
    • 2017
  • The objective of this study is to propose a modification of the previously proposed drainage system for catching the partial leakage of underground concrete structures. Two techniques were proposed for applying the drainage system only to the leaking parts. One was for conveying leaking groundwater to the collection point in the drainage system and the other was for conveying the collected groundwater to the primary drainage system of the underground concrete structure. Four waterproofing materials for conveying leaking groundwater to the catchment point of the drainage system, Durkflex made of porous rubber material, KE-45 silicone adhesive with super strong adhesion, Hotty-gel made of polymeric materials and general silicone adhesive were evaluated for waterproofing performance. Hotty-gel only showed perfect waterproof performance and the other three waterproof materials leaked. The modified drainage system with Hotty-gel and drainage pipe with fixed saddle to convey the leaking groundwater from the catchment point to the primary drainage system were tested on the concrete retaining wall. The waterproof performance and the drainage performance were evaluated by injecting 1,000 ml of water in the back of the modified drainage system at the 7-day, 14-day, 21-day, 28-day, 2-month and 3-month. There was no problem in waterproof performance and drainage performance of the modified drainage system during 3 months. In order to evaluate the construction period and construction cost of the modified drainage system, it was compared with the existing leaching repair method in surface cleaning stage, leakage treatment stage, and protective barrier stage. Total construction period and construction cost were compared in considering the contents of work, repair material, construction equipment, working time, and total number of workers. As a result of comparing and analyzing in each construction stage, it was concluded that the modified drainage system could save construction period and construction cost compared to the existing leaching repair method.

Settlement Instrumentation of Greenhouse Foundation in Reclaimed Land (간척지 온실 기초의 침하량 검토)

  • Choi, Man Kwon;Yun, Sung Wook;Yu, In Ho;Lee, Jong-Won;Lee, Si Young;Yoon, Yong Cheol
    • Journal of Bio-Environment Control
    • /
    • v.24 no.2
    • /
    • pp.85-92
    • /
    • 2015
  • This study examined the settlement of a 1-2W type greenhouse using a timber pile, which was recently established on Gyehwa-do reclaimed land, in order to obtain base data for the construction of a greenhouse on reclaimed land. The results of this study are as follows. foundation and timber pile increased over time, irrespective of the interior and exterior of the upon investigation of the ground, it was confirmed that there was no soft rock stratum (bedrock), and that a sedimentary stratum existed under the fill deposit, which is estimated to have been reclaimed during the site renovation. It was also found that a weathered zone was located under the fill deposit and sedimentary stratum, and that the soil texture of the entire ground floor consisted of clay mixed with sand, silty clay, and granite gneiss, in that order, regardless of boreholes. In addition, the underground water level was 0.3m below ground, regardless of boreholes. Despite a slight difference, the settlement of the greenhouse or measurement sites (channels). With regard to the pillar inside the greenhouse, except in the case of CH-2, the data at a site located on the side wall of the greenhouse (wind barrier side) indicated vibrations of relatively larger amplitude. Moreover, the settlement showed a significant increase during a certain period, which was subsequently somewhat reversed. Based on these phenomena, it was verified that the settlement range of each site in the interior and exterior of the greenhouse was between 1.0 and 7.5mm at this time, except in the case of CH-1. The results of the regression analysis indicated good correlation, with the coefficient of determination by site ranging between 0.6362 and 0.9340. Furthermore, the coefficient of determination ranged between 0.6046 and 0.8822 on the exterior of the greenhouse, which is lower than inside the greenhouse, but still indicates significant correlation.