• Title/Summary/Keyword: underground extension

Search Result 90, Processing Time 0.03 seconds

A study on Underground and Above-ground Extensions of Buildings using Jack-piles (잭파일을 활용한 건축물의 지하 및 지상증축에 관한 연구)

  • Kang, Seong-Jin;Byun, hang Yong;Hwang, Tae-il;Sho, Kwang-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.23-24
    • /
    • 2022
  • There are many demands for vertical extension construction method in domestic large cities. In this paper, we analyzed and presented the results of examining the cases of ground floor extension and basement extension using the jack pile method. Since the Jack Pile method presses in all the piles without excavating the ground, the bearing capacity of the all the piles can be checked. It was investigated as a safe construction method unlike other small-diameter pile construction methods during underground extension.

  • PDF

Analysis of the Amount of Construction and Demolition Waste Generated by Underground Vertical Extension Methods (지하수직증축공법 적용에 따른 건설폐기물 발생량 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.273-274
    • /
    • 2021
  • This paper proposes a process to calculate the amount of construction and demolition (C&D) of underground vertical extension methods through considering the characteristics of used construction and demolished materials. The underground vertical extension methods analyzed in this paper were the bottom-up, normal top-down, and top-down methods with multi-post downward (MPD). In order to check the applicability of the proposed process, 24 illustrative examples were generated. The amount of C&D waste of the illustrative examples were calculated and compared. As the results, the top-down method with MPD was the most efficient method to reduce the amount of C&D waste.

  • PDF

Geotechnical parameters from pressuremeter tests for MRT Blue Line extension in Bangkok

  • Likitlersuang, Suched;Surarak, Chanaton;Wanatowski, Dariusz;Oh, Erwin;Balasubramaniam, Arumugam
    • Geomechanics and Engineering
    • /
    • v.5 no.2
    • /
    • pp.99-118
    • /
    • 2013
  • Construction of the extension project of the Bangkok MRT Blue Line underground railway was recently started in 2011. The construction of approximately 5 km long underground tunnel and 4 deep excavations of underground station are considered to be the most important geotechnical works. The pressuremeter was selected as a high-quality in situ testing of the soil to evaluate design parameters for the project. In addition, other field and laboratory tests such as vane shear and $CK_0U$ triaxial tests were included in the investigation programme. This paper aims to present the ground conditions encountered along the MRT Blue Line extension project as well as the site investigation and interpretation techniques with particular focus on the pressuremeter tests. The results are also compared with the pressuremeter investigation from the previous Bangkok MRT project.

Floating & Underground Space Extension Method for New Seoul City Hall (서울 시청사 뜬구조 공법)

  • Choi, Young-Gil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.254-255
    • /
    • 2013
  • New Seoul city hall completed in 1926 is a registered historical building. The remodeling plan has been developed for the expansion after the review by the governmental agency. Based on the plan, a new city hall should be constructed behind the current city hall while the facade, the main lobby and the dorm structure of the existing building, A new construction method, FUSEM, has been developed for this mission for the safety of the historical structure.

  • PDF

Analysis of electric characteristics for extension power supply between different grounding railway distribution system (접지방식이 상이한 철도배전계통의 연장급전을 위한 전기적 특성분석)

  • Jung, Ho-Sung;Han, Moon-Seob;Lee, Chang-Mu;Kwon, Sam-Young;Park, Hyeun-Jun
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.736-741
    • /
    • 2005
  • This paper presents electric characteristics analysis and safe configuration for extension power supply between existent 6.6kV ungrounded distribution system and establishment and improvement 22.9kV direct grounding distribution system. For this, we model 6.6kV ungrounded and 22.9kV direct grounding distribution system of urban underground, ground region. and rural electrical, unelectrical region using PSCAD/EMTDC and analyze voltage drop, charging current, ground and short fault through simulation. To analyze electric characteristics of extension power supply, we simulate extension power supply of overhead line of 6.6kV ungrounded system and underground line of 22.9kV direct grounding system of rural electrical region and propose operation condition for safe extension power supply through result of analysis. Characteristics of voltage drop, charging current, ground and short fault appear almost similarly with electrical characteristic of direct power supply. However, because unbalance of phases may cause relay's malfunction of ungrounded system and ground fault current of direct grounding system may demage facilities of ungrounded system, we propose safe system configuration such as impedance grounding system of neutral point.

  • PDF

From Fragmented Development to Three-Dimensional and Coordinated Development - Research on Renewal Strategies of Existing Underground Commercial Space in Harbin

  • Xue, Minghui;Su, Yiming;Hu, Jiayu
    • International Journal of High-Rise Buildings
    • /
    • v.10 no.1
    • /
    • pp.17-28
    • /
    • 2021
  • In Harbin, a network of underground commercial spaces has been developed to occupy spaces that were originally created as civil defense shelters. With the gradual extension of the local metro rail system, the existing underground commercial space is no longer an isolated regional development, but a space that represents "three-dimensional city" and coordinated development taking place in many Chinese cities. Based on the analysis of the unique development process taken in underground space of Harbin, this paper summarizes three characteristics of its early model of "fragmented development" of underground space. By conducting a comprehensive field research and survey, the researchers analyzed 472 questionnaires related to the development trend, and proposed multi-level synergistic elements for the renewal and development of underground commercial space. The paper concludes by discussing the trend of "three-dimensional and collaborative development," suitable for the development needs of the new era, and the corresponding development strategies for the renewal of underground space.

Rock fracturing mechanisms around underground openings

  • Shen, Baotang;Barton, Nick
    • Geomechanics and Engineering
    • /
    • v.16 no.1
    • /
    • pp.35-47
    • /
    • 2018
  • This paper investigates the mechanisms of tunnel spalling and massive tunnel failures using fracture mechanics principles. The study starts with examining the fracture propagation due to tensile and shear failure mechanisms. It was found that, fundamentally, in rock masses with high compressive stresses, tensile fracture propagation is often a stable process which leads to a gradual failure. Shear fracture propagation tends to be an unstable process. Several real case observations of spalling failures and massive shear failures in boreholes, tunnels and underground roadways are shown in the paper. A number of numerical models were used to investigate the fracture mechanisms and extents in the roof/wall of a deep tunnel and in an underground coal mine roadway. The modelling was done using a unique fracture mechanics code FRACOD which simulates explicitly the fracture initiation and propagation process. The study has demonstrated that both tensile and shear fracturing may occur in the vicinity of an underground opening. Shallow spalling in the tunnel wall is believed to be caused by tensile fracturing from extensional strain although no tensile stress exists there. Massive large scale failure however is most likely to be caused by shear fracturing under high compressive stresses. The observation that tunnel spalling often starts when the hoop stress reaches $0.4^*UCS$ has been explained in this paper by using the extension strain criterion. At this uniaxial compressive stress level, the lateral extensional strain is equivalent to the critical strain under uniaxial tension. Scale effect on UCS commonly believed by many is unlikely the dominant factor in this phenomenon.

A Study on Remodeling Method of Library Architecture (도서관건축의 리모델링 수법)

  • Lee, Ji-Young
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.1
    • /
    • pp.3-10
    • /
    • 2017
  • This study is to analyze the remodeling method of library in terms of space extension method and urban regeneration by repurposing function in unused facilities through case study. In many case of library extension, horizontal extensions are more frequent than vertical extensions, because there are limits to extend vertically due to high live load estimation by book stacks. Extension schemes was organized by new building extension method in connection with existing buildings, attaching method small scaled mass or linear mass to existing building, connecting method a plurality of existing small buildings, vertical extension method on the top of the structure, underground extension method using special structure. Unused facility remodeling to the library, large scaled buildings can be developed completely to the function of the library through the relocation of the space, while small scaled building needs spatial extension. In the case of spatial extension, existing space that was used for other purposes can be used as a reading room or office, avoiding high live load estimation.

Behavior Case Study of Temporary Structures during Underground Extension Work by Field Measurement (현장계측을 통한 지하증축공사 중 가설구조물의 거동 사례연구)

  • Kim, Uiseok;Min, Byungchan;Kang, Minkyu;Kim, Dongkwan;Choi, Hangseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.8
    • /
    • pp.5-13
    • /
    • 2020
  • During the construction of underground space expansion of old facilities, it is necessary to secure temporary residence space for existing residents as well as noise and vibration issues during construction, and in the case of commercial, industrial, and social use, damage is expected from suspension of the use of facilities. There is a need for a technology that minimizes noise and vibration during underground expansion, enabling the use of existing facilities even during construction. In this study, a practical underground extension model is proposed by analyzing the behavior of the temporary structure and the surrounding ground as a result of measurement at each construction stage for a actual construction site. In order to solve the problems that occurred during construction, the basement slabs were placed in advance after the initial excavation. The measurement results (building inclinometer, crack measurement system, structure inclinometer and surface settlement meter) at the site were reviewed to analyze the behavior of the temporary structure and surrounding ground. As a result, it was confirmed that the inclinometer of the building and the structural inclinometer showed a tendency that the displacement after the slab line was placed was reduced or converged. The placement of basement slabs during underground extension not only relived the noise and vibration problems during construction, but also secured the stability of structures.

Modeling the Water-Block Interaction with Discontinuous Deformation Analysis Method (불연속 변형 해석법에 의한 지하수-암반블록 상호작용 모델링)

  • 김용일
    • Tunnel and Underground Space
    • /
    • v.9 no.2
    • /
    • pp.149-157
    • /
    • 1999
  • A powerful numerical method that can be used for that purpose is the Discontinuous Deformation Analysis (DDA) method developed by Shi in 1988. In this method, rock masses are treated as systems of finite and deformable blocks. Large rock mass deformations and block movements are allowed. Although various extensions of the DDA method have been proposed in the literature, the method is not capable of modeling water-block interaction that is needed when modeling surface or underground excavation in fractured rock. This paper presents a new extension to the DDA method. The extension consists of hydro-mechanical coupling between rock blocks and water flow in fractures. A example of application of the DDA method with the new extension is presented. The results of the present study indicate that fracture flow could have a destabilizing effect on the tunnel stability.

  • PDF