• 제목/요약/키워드: under construction

검색결과 5,294건 처리시간 0.04초

Intelligent management system for tunnel under construction using ITIS (Intelligent Tunnelling Information System)

  • Kim Changyong;Hong Sungwan;Bae Gyujin;Kim Kwangyeom
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.170-175
    • /
    • 2003
  • Ground and rock mass considered in tunnelling have characteristics such as uncertainty, heterogeneity and structural complexity because they have been formed undergoing various geological events for a long period. So, it is difficult for engineers to predict behaviors of rock mass in tunneling. In the paper the authors describe the development of an integrated expert system prototype for site investigation, design and construction in tunnelling and introduce the case applying this system to the tunnel construction site under construction. Geostructure Research Group in Korea Institute of Construction Technology (KICT) has developed the system during the past 4 years. The system mainly consists of several modules which is related to the design, construction and management of tunnelling. The test site, Neung-dong tunnel is located in Ulsan, Korea. The geology map shows it may confront big fault zone whose width is over kilometres. With the networking system of ITIS, various information of face mapping, monitoring and other construction task can be transmitted into the database and GIS Server at real time. And necessary analyses can be carried out with the modules equipped in the system.

  • PDF

절토사면 하부의 과도한 굴착에 따른 붕괴 사례 연구 (A Case Study on Slope Failure by Excessive Under Cut)

  • 이종현;김승현;구호본
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.1154-1160
    • /
    • 2009
  • Cut slope failure is happened in various form by several causes. In this study, we searched causes of cut slope failure shortly, and we made a study of slope failure by excessive under cut. Under cutting slope does to add unstability. Thereby, cut slope failure can be happened on a large scale.

  • PDF

굴착공사 중 계측결과 활용을 통한 효과적인 현장관리 사례 분석 (The Case Study of the Effective Management of the Site Using Measurement Result During the Excavation Construction)

  • 남궁한;정경식;고형선
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.428-444
    • /
    • 2010
  • After underground excavation being introduced in dometic, many technologies have been storing up. One of them, measurement, has been recognized as an important item under excavation construction. But, unlike a large-scale construction, it was not been treated importantly at the general small-scale structures with poor ordering and original design was unchanged under construction was normal if the problem didn't occur on monitoring. In this paper, the site which safe and economical management as well as shortening construction period was made effectively using measurement result was introduced. Also, the site which was completed safely with analyzing measurement and reinforcement when unusual symptom happened was introduced. Using measurement result effectively will be able to obtain the safety and prevent unnecessary economical loss.

  • PDF

한중콘크리트 보온양생 공법에 대한 VE분석 (Value Engineering Approach for Heat Curing Method Under Cold Weather Condition)

  • 우대훈;김태청;김종;전충근;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.21-23
    • /
    • 2010
  • This study was conducted to draw various decisive elements of a reasonable heat curing method and to examine the importance in deciding a construction method when constructing cold weather concrete. As a result, the items proposed as important elements at the time of decision of a heat curing method included economy, workability, maintainability, insulation capability, reduced construction period and usability. As a result of importance by items under AHP technique, it was found the most important element was insulation capability, followed by reduced construction period and workability. As a result of comparison of a heat supplying and a heat insulation method by dual bubble sheet differed 2 times as much as a heat supplying method, especially the evaluation degree by insulation capability and reduced construction period was high.

  • PDF

시공기간을 고려한 주거용 철근콘크리트 건물의 시공 중 지진하중 영향 분석 (Effect of Seismic Load on Residential RC Buildings under Construction Considering Construction Period)

  • 최성현;김재요
    • 한국전산구조공학회논문집
    • /
    • 제35권4호
    • /
    • pp.235-242
    • /
    • 2022
  • 시공 중인 건물은 시공이 완료된 건물과는 다르게 콘크리트의 강도발현이 충분히 이루어지지 않았기 때문에 지진과 같은 자연재해에 더 취약한 모습을 가질 수 있다. 현재 국내 기준은 건축물의 내진등급별 최소성능 목표를 제시하고 있지만, 설계를 위한 지진하중은 재현주기 2,400년의 지진위험도를 기반으로 한다. 하지만 건물의 시공기간은 건물의 사용기간보다 훨씬 짧기 때문에 재현주기 2,400년의 지진을 시공 중인 건물에 적용하는 것은 과도하다. 따라서 이 연구는 주거용으로 사용되는 철근콘크리트 건물의 시공 중 지진하중을 분석하기 위해 5층, 15층, 25층, 60층 건물의 시공단계모델을 작성하고 재현주기에 따라 저감한 지진하중을 적용하여 구조적 안정성을 확인하였다. 그 결과, 시공기간에 따라 선정한 재현주기의 지진을 적용할 때 구조적 안정성을 확인하였으며, 건물의 규모의 따라 구조적 안전성을 확보할 수 있는 지진재현주기를 확인하였다.

논 문 3 - 건설업 공사관리에 미치는 직무스트레스 요인에 관한 연구 (A study on the job stress influencing to the construction management in construction industry)

  • 박해천;정태현
    • 건설안전기술
    • /
    • 통권53호
    • /
    • pp.52-62
    • /
    • 2011
  • Purpose of this study was to comprehend the influence that worker's lob stress caused by the distinct characteristics of construction work affect on construction management. Proven through previous studies of job stress measurement method, physical environment, job demands, job autonomy, interpersonal conflict are derived as typical factors. We analyzed causal relationships between the factors using structural equation modeling under the hypothesis that job stress have effect on the construction management. As a result, successful job stress management for construction management plan is proposed.

  • PDF

Shear-lag behavior of prestressed concrete box-girder bridges during balanced cantilever construction

  • Zhong, Xingu;Zhang, Tianyu;Shu, Xiaojuan;Xu, Hongliang
    • Advances in concrete construction
    • /
    • 제5권5호
    • /
    • pp.469-479
    • /
    • 2017
  • Balanced cantilever construction is extensively used in the construction of prestressed concrete (PSC) box-girder bridges. Shear-lag effect is usually considered in finished bridges, while the cumulative shear-lag effect in bridges during balanced cantilever construction is considered only rarely. In this paper, based on the balanced cantilever construction sequences of large-span PSC box-girder bridges, the difference method is employed to analyze the cumulative shear-lag effect of box girders with varying depth under the concrete segments' own weight. During cantilever construction, no negative shear-lag effect is generated, and the cumulative shear-lag effect under the balanced construction procedure is greater than the instantaneous shear-lag effect in which the full dead weight is applied to the entire cantilever. Three cross-sections of Jianjiang Bridge were chosen for the experimental observation of shear-lag effect, and the experimental results are in keeping with the theoretical results of cumulative shear-lag effect. The research indicates that only calculating the instantaneous shear-lag effect is not sufficiently safe for practical engineering purposes.

언더텐션 시스템이 적용된 축소 실험체의 구조적 성능에 대한 연구 (Experimental Investigation of Large-Span Girder with Under-Tension System)

  • 김영민;박대하;이기학;이재홍
    • 한국강구조학회 논문집
    • /
    • 제22권4호
    • /
    • pp.345-354
    • /
    • 2010
  • 기존의 빔과 거더로 이루어진 장스팬 구조물의 경우 기둥 사이의 거리가 길기 때문에 부재의 크기와 수직 처짐이 증가하게 된다. 효과적인 장스팬 구조물의 실현을 위하여 구조물 하부에 스트럿과 케이블로 구성된 언더텐션시스템을 적용하였다. 이는 거더의 휨모멘트를 효과적으로 분산시키기 때문에 부재의 크기를 줄이고 경제적인 효과를 기대할 수 있다. 또한 급속시공을 위한 폐단면 신형상의 모듈화 PF500단면을 사용하여 성능을 검증하고자 하였다. 언더텐션 시스템의 성능검증을 위하여 가로 10m, 세로 2.4m의 실험체 두개를 대상으로 가력실험을 실시하였고 언더텐션 시스템 유무와 케이블 장력변화에 따른 거동을 확인하였다. 실험으로부터 케이블 장력이 증가함에 따라 실험체의 거동이 작아졌으며 언더텐션 시스템이 하중분배 역할을 수행하는 것으로 나타났고 PF500단면의 성능이 우수함을 나타내었다.

철로하부의 강관압입 시 발생되는 지반변위 및 진동에 대한 영향평가 (Estimation of Effect for Vibration and Displacement Occurred by Steel Tube Jacked under Railroad)

  • 박승욱;김홍기;박해일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.568-577
    • /
    • 2001
  • An important and cotinuing research effort has been concentrated to estimate safety for behavior of soil nearby construction site. This construction under ground would cause the soil to deform and vibrate at any direction. This paper presents to estimation of safety for movement and reliability for vibration due to steel tube jacked under ground.

  • PDF

제주해역 항만시설물의 수리환경적 특성에 관한 연구 (The Hydro-Environmental Characteristics of Port Facilities around the Sea of Cheju Island)

  • 정태욱;김종인;류청로
    • 한국해양공학회지
    • /
    • 제14권3호
    • /
    • pp.1-10
    • /
    • 2000
  • In order to effective manage the construction, disaster prevention plan and the harbor tranquility control, meteorological and sea-state characteristics around Cheju Island have been analyzed. Using results and damage examples of the port facilities under severe sea conditions, a reasonable construction control plan considering the regional characteristics of the sea-state and winds was proposed. That is, in northern part of Cheju Island, the construction work is affected mainly by the winter storms, while the typhoon mainly affects the southern part port facilities during summer to Autumn. Considering their typical characteristics, it is strongly suggested that the main construction work should be carried out during April to July in the northern part, and it should be made during October to next July in the southern part of the island. A permeable TTP mounded breakwater was constructed to protect severe waves as a temporal structure under the long-term development plan in Sogipo port. The transmission characteristics of the structure was discussed using the experimental results. The results show that the transmission coefficient $K_{t}$ is over 20% of incident waves, which cause many problems in the cargo handling in relation to harbor tranquility. In conclusion, this kind of permeable structure can be used only as a temporal structure for the disaster prevention under the construction process. It causes many problems in harbor tranquility if it is used as a permanent harbor structures.s.

  • PDF