• Title/Summary/Keyword: turnkey projects

Search Result 24, Processing Time 0.019 seconds

Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects (해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안)

  • Lee, Won-Gyu;Park, Moon-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.3-14
    • /
    • 2010
  • This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.

Estimation Method of the Competitive Bid-price in Bid-rigging of Public Construction (기댓값 분석에 따른 공공공사 입찰담합의 가상경쟁가격 산정방법)

  • Jeong, Kichang;Kim, Wooram;Kim, Namjoon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.52-60
    • /
    • 2018
  • Korea's public construction projects are under construction through bidding, however, due to the nature of the bidding, collusion between participants can occur. The collusion of bids accordingly damages the client. So, it is necessary to calculate the appropriate fictitious competition price to compensate for this. In this regard, econometrics methods are generally used, but there are limitations and issues arising from the nature of construction, especially design-build bid. Therefore, this study proposes a method to estimate reasonable competitive bid-price in design-build bid. It derives the lowest bid-price from the design submitted by the proponent and estimates the competitive bid-price by examining the factors according to the penetration rate according to the technical level of the tester, the skill level of the competitor, and the type of tester. Based on the method proposed in this study, a reasonable price can be derived that reflects the characteristics of the design and construction bidding bidder selection method and also it can be used as a reference material in the actual bidding process as well as calculating the damage due to the answer.