• Title/Summary/Keyword: tunnel inspection

Search Result 182, Processing Time 0.017 seconds

A study on smart inspection technologies and maintenance system for tunnel (터널 스마트 점검기술 및 유지관리 제도 분석에 관한 연구)

  • Jee-Hee Jung;Kang-Hyun Lee;Sangrae Lee;Bumsik Hwang;Nag-Young Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.6
    • /
    • pp.569-582
    • /
    • 2023
  • In recent years, the service life of major SOC facilities in south korea has exceeded 30 years, and rapid aging is expected within the next 10 years. This has led to a growing recognition of the need for proactive maintenance of these facilities. Consequently, there have been numerous research efforts to introduce smart inspection technologies into maintenance. However, the current system relies primarily on manpower for safety inspections and diagnostics, and on-site surveys rely on visual inspections. Manpower inspections can be time-consuming, and subjective errors may occur during result analysis. In the case of tunnels, there are disadvantages, such as the loss of social overhead capital due to partial closures during inspections. Therefore, institutionalizing smart safety inspections is essential, considering specific measures like using advanced equipment and updating qualifications for experts. Furthermore, it is necessary to verify and validate safety inspection results using advanced equipment before instituting changes. This could be achieved through national-level official research programs and the operation of verification and validation institutions. If smart inspection technology is introduced into maintenance, routine inspections of SOC facilities, such as tunnels, will become feasible. As a result, maintenance technology capable of early detection and proactive response to safety incidents caused by changes in facility conditions is anticipated.

Spatial Ground Zoning and Analysis of Geotechnical Characteristics Considering Tunnel Interface (터널 간섭에 따른 지반의 공간 구역화 및 지반공학적 특성 분석)

  • Jeon, Je-Sung;Kim, Yong-Seong;Kim, Ki-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.4
    • /
    • pp.252-260
    • /
    • 2005
  • In this research, case studies considering tunnel interface were conducted for zoning the ground into spatial area having similar geotechnical characteristics and estimating geotechnical properties for each area. The site for analysis consists of banded biotite gneiss, biotite schist and granite gneiss with spatial non-homogeneity, and for that reason weathering and fault zone were distributed with large scale. It's important thing to consider spatial ground zone and their geotechnical properties properly into stability analysis at design and construction stage. Also, in this studies, these analysis works are very useful for further decision making process by stability analysis.

Mechanical Properties of Concrete using Alpha-Calcium Sulfate Hemihydrate (알파형 반수석고를 활용한 콘크리트의 역학적 특성)

  • Shin, Kyoung-Su;Kim, Gyu-Yong;Sung, Gil-Mo;Woo, Sang-Kyun;Lim, Byung-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.7
    • /
    • pp.72-79
    • /
    • 2019
  • Concrete is vulnerable to cracks due to volume changes caused by temperature changes, shrinkage during curing, external forces, or poor construction. In particular, concrete placed in electric power tunnel structures can generate cracks by a variety of factors. As a result, these tunnel structures require continuous maintenance. In this study, we investigated the mechanical properties of electric power tunnel concrete using alpha-calcium sulfate hemihydrate, which is an industrial byproduct that has excellent expansion performance. To compensate for the decrease in compressive strength when substituting alpha-calcium sulfate hemihydrate, based on previous research, we added 9% alpha-calcium sulfate hemihydrate and adjusted the amount of admixture while using the same amount of cement. We then evaluated the mechanical properties of the concrete. The results showed that the compressive strength of the concrete was higher than that of ordinary Portland cement (OPC), and the shrinkage of concrete was reduced by more than 30% compared to that of OPC. Therefore, adding 9% of alpha-calcium sulfate hemihydrate is expected to have a significant effect in reducing concrete cracks.

An Estimation of the Temperature-dependent Thermal Conductivity for Hybrid-fiber Reinforced Shield Tunnel Lining (하이브리드 섬유보강 쉴드터널 라이닝의 온도의존적 열전도도 추정)

  • Lee, Chang Soo;Kim, Yong Hyok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.4
    • /
    • pp.99-106
    • /
    • 2012
  • This study presents estimation method of temperature-dependent thermal conductivity by using solution of inverse heat conduction problem. Time and depth temperature distribution data from full-scale fire test were used for estimating temperature-dependent thermal conductivity on hybrid-fiber reinforced shield tunnel lining. At short heating time, estimated thermal conductivity sharply decreased within $100^{\circ}C$. On the other hand, it reflected thermal properties of concrete and effect of steel fiber at heating time of measured maximum heating temperature. Thus arbitrary time should be determined to estimate temperature-dependent thermal conductivity in time zone of measured maximum heating temperature. Estimated temperature-dependent thermal conductivity is similar to results of other study.

Development of Performance Prediction Method for Bridge and Tunnel Management Decision-making (교량 및 터널 시설물의 유지관리 의사결정을 위한 성능 예측 방법 개발)

  • Lee, Dong-Hyun;Kim, Ji-Won;Jun, Tae-Hyun;Jeong, Won-Seok;Park, Ki-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.1
    • /
    • pp.33-40
    • /
    • 2016
  • In this study, using the Cost Prediction Model and Performance Prediction Model have developed a way to estimate future management costs and performance for bridge and tunnel by Network Level. Studies to date have primarily focused on the single facility, it is difficult to apply to the analysis of the Network Level. This study, items used as an index of 'Special Act for the Safety Control of Public Structures' was added to Usability and Functionality to Status. Action period and annual budget for each facility can be estimated through the Basic and Advanced analysis. In addition, we verified the technical feasibility through case analysis.

Methodologies for Survey and Retrofit of Small Dams Pierced by Diversion Tunnel (복통을 갖는 저수지의 결함 조사 및 보수보강 방안)

  • Jang, Bong Seok;Im, Eun Sang;Oh, Byung Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.2
    • /
    • pp.75-82
    • /
    • 2008
  • There are almost 18,000 dams including about 1,200 large dams in Korea. The large dams are well operated and maintained by KWATER(Korea Water Resource Corporation), KRC(Korea Rural Community & Agriculture Corporation) and KHNP(Korea Hydro & Nuclear Power Co., Ltd.). Several research reports concern with the safety of these large dams are presented but there is no paper concerned with small dams which has diversion tunnel through the dam body. The purpose of this study is to show the common defects of small dams according to various cases of degradation of dams and the repair and retrofit methods which applied to the damaged dams. And this study performed resistivity survey to evaluate the effect of retrofitting dam. Also, this study tries to present the solution which concerned with these common defects in maintenance and design steps.

Study on the Applicability of High Frequency Seismic Reflection Method to the Inspection of Tunnel Lining Structures - Physical Modeling Approach - (터널 지보구조 진단을 위한 고주파수 탄성파 반사법의 응용성 연구 - 모형 실험을 중심으로 -)

  • Kim, Jung-Yul;Kim, Yoo-Sung;Shin, Yong-Suk;Hyun, Hye-Ja;Jung, Hyun-Key
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.3
    • /
    • pp.37-45
    • /
    • 2000
  • In recent years two reflection methods, i.e. GPR and seismic Impact-Echo, are usually performed to obtain the information about tunnel lining structures composed of concrete lining, shotcrete, water barrier, and voids at the back of lining. However, they do not lead to a desirable resolution sufficient for the inspection of tunnel safety, due to many problems of interest including primarily (1) inner thin layers of lining structure itself in comparison with the wavelength of source wavelets, (2) dominant unwanted surface wave arrivals, (3) inadequate measuring strategy. In this sense, seismic physical modeling is a useful tool, with the use of the full information about the known physical model, to handle such problems, especially to study problems of wave propagation in such fine structures that are not amenable to theory and field works as well. Thus, this paper deals with various results of seismic physical modeling to enable to show a possibility of detecting the inner layer boundaries of tunnel lining structures. To this end, a physical model analogous to a lining structure was built up, measured and processed in the same way as performed in regular reflection surveys. The evaluated seismic section gives a clear picture of the lining structure, that will open up more consistent direction of research into the development of an efficient measuring and processing technology.

  • PDF

A study on damage mechanism of transition section in cut and cover tunnel using 3 dimensional numerical analysis (3차원 수치해석을 통한 개착터널내 단면변화구간의 손상미케니즘 연구)

  • Park, Jae-Young;Son, Jeong-Hun;Park, Kwang-Lim;Oh, Young-Seok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.653-666
    • /
    • 2012
  • This study made progress about Demage Mechanism of Transition Section in Cut and Cover Tunnel. For this study, Inspection and test was carried out about Transition Section. After this process, Numerical Analysis was accomplished by 2D, 3D. A result of inspection and test, It couldn't find the reason why the upper slab Demage was detected. So 2D Numerical Analysis was conducted. It was analyzed that the Safety Factor(1.0) was satisfied in 2D. But, the result of 3D Numerical Analysis, The reason was found that the Demage on upper slab was caused by moment change. The Moment was changed by column interval transition. For Retrofitting, Column was added under slab in tunnel. It was found that the addition column decreased upper slab deformation. After this study, It could be find that are important 3D Numerical Analysis as well as 2D Numerical Analysis in case of Transition Section. This Study can help developing construction and maintenance about Tunnel. Finally, It's going to study Retrofitting plans which have minimum influence of Transition Section in Cut and Cover Tunnel.

Influences of Grouting Pressure of Microcement to Upper Structures (지반보강용 마이크로시멘트의 주입압이 상부구조물에 미치는 영향)

  • Hwang, Chul-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.70-77
    • /
    • 2010
  • Microcement grouting and micro pile are frequently used for ground modification during tunnel construction. The influence of grouting pressure of microcement grouting and micro pile to the existing bridge which is directly over the constructing tunnel is investigated. Three dimensional seepage flow-structure interactive analysis considering firm water pressure with full stages of construction including the construction of upper bridge, microcement grouting, micro pile and tunnel is performed. The settlement and tilting of the pier of existing bridge violate the design code and the reaction of the bridge are highly increased after grouting. The stress of tunnel bracings such as rockbolt and shotcrete also exceed the limit of the code. The pressure of microcement grouting is confined by bedrock and transmit to the surrounded soil and the upper bridge. Microcement grouting needs mid-high pressure to penetrate through weak fault plane and the pressure greatly influence the safety of the upper structure. It is important to decide and care the grouting pressure to improve weak fault plane directly under the existing structures and the pressure of microcement grouting should be considered in underground analysis.

Study on Determination of Proper Pillar Width in Road Tunnel Design Stage (도로터널에서 적정한 필라폭 산정에 관한 연구)

  • Yang, Tae-Seon;Kim, Jae-Kyoung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.5
    • /
    • pp.187-194
    • /
    • 2010
  • As the design of the pillar width (PW) of the parallel tunnels in downtown area, in which are located in plains zone with deep alluvium compared with mountain tunnels, is directly related with pre-compensation payment and costs of the underground area, it has to be planned as to keep minimum distance while securing the stability of the parallel tunnels. Although PW of downtown road tunnel in Korea is standardized as 1.5D(D: diameter of the tunnels), PW sometimes has to be reduced within 1.5D to adjust the tunnel lines to the city plan in the cases of the inlet and outlet of the tunnels. In this paper, the design and the analyses of optimum PW of the NATM type road tunnel in the downtown area are introduced. The relationship among the tunnel line planning and underground compensation fee, and ground characteristics are evaluated. In the determination of PW distance, the numerical analyses of underground road tunnels were performed, including the use of the strength decrease method and strength/stress ratio method. In the cases of inlet and outlet part of the tunnels where the stability of the pillars is poor due to contiguous construction of the parallel tunnels, the reinforcement methods are recommended for securing the stability. Numerical verification was performed for the reinforcement proposed.