A Study on Efficiency Improvement through Productivity Analysis Based on TBM Operation Data (TBM공법 적용 현장별 생산성 분석을 통한 효율성 개선 방안)

  • Park, Hong Tae;Song, Young Sun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1D
    • /
    • pp.71-77
    • /
    • 2010
  • This study presented the operation method through of productivity on eight analysis work items (TBM boring, cutter check and exchange, TBM maintenance, succeeding facilities, reinforcement in tunnel, operation alternation, a tram car) which have developed equipment at WRITH with TBM a waterway tunnel works. It was inquired lose time with analyzed result by work items and removed lose time. It was analyzed TBM boring length, TBM boring length percentage and TBM boring length time. This study analyzed TBM operation utility factor of a foreign work with TBM operation boring length percentage, a monthly average boring length, pure boring length percentage etc. and assumed a monthly average boring length and a monthly average boring length of rise forecast. Based on analyzed Data, TBM boring has been forecasted propriety pure boring length at compressive strength $675{\sim}1662kgf/cm^2$.

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

Study on the Workability of Raise Boring Machine in Korea (국내 Raise Boring Machine의 굴착능력에 관한 연구)

  • 이석원;조만섭;배규진
    • Tunnel and Underground Space
    • /
    • v.13 no.3
    • /
    • pp.196-206
    • /
    • 2003
  • In order to investigate the workability of Raise Boring Machine(RBM) such as utilization, penetration rate and advance rate, a vertical shaft of 98 m in length and 3.05 m in diameter was constructed in the layer of conglomerate by using the RBM in this study. In addition, field data from tow different construction sites including water-pump power plant tunnel, roadway tunnel and mining tunnel by RBM were collected and analyzed. The results show that the average weekly bored length is 19.3 m and its average utilization is between 54.3 % and 75.1 % very higher than that of the TBM(Tunnel Boring Machine). It also turns out that the bit force increases linearly with respect to the increase of the RPM(revolution per minute) of RBM. However, the net penetration rate decreases with the increase of bit force, RPM of RBM and depth of shaft. The findings of this study can be used to provide the useful information for the design of shaft and the selection of RBM.

Development of Flow Control Block for Hydraulic System of Tunnel Boring Machine (터널 굴착기 유압시스템용 유량 제어 블록 개발)

  • Lee, Jae-Dong;Lim, Sang-Jin
    • Journal of the Korean Society of Mechanical Technology
    • /
    • v.20 no.6
    • /
    • pp.929-935
    • /
    • 2018
  • This paper develops a flow control block for a hydraulic system of a tunnel boring machine. The flow control block is a necessary component to ensure stability in the operation of the hydraulic system. In order to know the pressure distribution of the flow control block, the flow analysis was performed using the ANSYS-CFX. It was confirmed that the pressure and flow rate were normally supplied to the hydraulic system even if one of the four ports of the flow control block was not operated. In order to evaluate the structural stability of the flow control block, structural analysis was performed using the ANSYS WORKBENCH. As a result, the safety factor of the flow control block is 1.54 and the structural stability is secured.

Comparison of the RMR Ratings by Tunnel Face Mappings and Horizontal Pre-borings at the Fault Zone in a Tunnel (터널 단층대에서 수평시추와 막장관찰에 의한 RMR값의 비교 분석)

  • Kim Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.1 s.54
    • /
    • pp.39-46
    • /
    • 2005
  • The RMR ratings, one by horizontal pre-boring in a tunnel and another by tunnel face mapping, are compared at the fault zone in a tunnel. Generally. the horizontal pre-borings were so effective as to forecast reasonably the supporting patterns after tunnel excavation. But the maximum difference in RMR ratings estimated by two methods was about 50 at a certain section of a tunnel. The differences were analyzed on each parameter of the RMR system: the rating differences were 24 in the condition of discontinuities, 15 in the RQD and 13 in the uniaxial compressive strength of rock. To minimize the gap between RMR by pre-borings and by face mappings, it is necessary to select the horizontal pre-boring location where tunnel stability could be critical and to evaluate in detail the sub-parameters of the condition of discontinuities.

Application of Rotary Cutting Test for Performance Assessment of Tunnel Boring Extender (TBE의 굴착성능 평가를 위한 회전식 절삭시험의 적용)

  • Jeong, Hoyoung;Jeon, Seokwon;Cho, Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.32 no.4
    • /
    • pp.243-253
    • /
    • 2022
  • In this study, the cutting efficiency of TBE (Tunnel Boring Extender) was evaluated by using rotary cutting tester. In the rotary cutting test, a specimen which has a drilled hollow hole at the center was made of rock-like material. The specimen was cut by UDC (undercutting disc cutter) with spiral cutting path to simulate the cutting process of TBE. The cutting forces and specific energy were evaluated under different cutting conditions. The results indicated that the cutter forces of UDC linearly increased with the vertical and radial penetration depths. Among the three directional cutter forces, the normal force is larger than other force components. While the specific energy decreased with the two penetration depths, in particular, it was presumed that the specific energy was minimized at a certain value of the ratio of radial to vertical penetration depth.

The Evaluation of Work Noise in Tunnel under Construction (터널 내 작업소음 평가)

  • Yun, Chang-Yeon
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.3
    • /
    • pp.103-107
    • /
    • 2014
  • To assess a various of workplace noise environment in the tunnel construction site, the measurement is performed while tunnel constructing work. This study focuses on the sound attenuation according to the sound frequency characteristics and the distance from various works in the tunnel. Also, the noise distribution while blasting work is measured according to distance in this study. In addition, the boring processing, muck treatment, and tunnel lining by distance are measured for the noise distributions.

Modelling for TBM Performance Prediction (TBM 굴진성능 예측을 위한 모델링)

  • 이석원;최순욱
    • Tunnel and Underground Space
    • /
    • v.13 no.6
    • /
    • pp.413-420
    • /
    • 2003
  • Modelling for performance prediction of mechanical excavation is discussed in this paper. Two of the most successful performance prediction models, namely theoretical based CSM model and empirical based NTH model, are discussed and compared. The basic principles of rock cutting with disc cutters, especially Constant Cross Section cutters, are discussed and a theoretical model developed is introduced to provide an estimate of disc cutting forces as a function of rock properties and the cutting geometry. General modelling logic for the performance prediction of mechanical excavation is introduced. CSM computer model developed and currently used at the Earth Mechanics Institute(EMI) of the Colorado School of Mines is discussed. Example of input and output of this model is illustrated for the typical operation by Tunnel Boring Machine(TBM).

A Study on Starting Characteristic and Improvement for High Power Motor with Tunnel Boring Machine (TBM용 대용량 전동기의 기동 특성 및 개선 관한 연구)

  • Kim, Tae-Kue;An, Joon-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.68 no.1
    • /
    • pp.44-51
    • /
    • 2019
  • Tunnel Boring Machine's Technology has depends mostly on imports, currently domestic technology development was proceeding. There are many technologies in this field, above all, the large-capacity motor drive technology required for excavation is one of the core technologies. In particular, when several large motors are simultaneously starting, there are many problems due to a large starting current at that time, and it is difficult to design and operate a power receiving facility. In this paper, A method of reducing the starting current by using the regenerative power generated by the deceleration of the motor has been studied. To verify this proposal, we designed the induction motor controller using CAE based power simulation tool and verified the results of the proposed method by applying the reduced model. As a result, it is possible to reduce the maximum starting current and shorten the start-up time. Moreover, even if several motors are connected to one bank, it is proved that the method can be efficiently operated by using the sequential braking / starting sequence. In the case of a power system in which a large capacity electric motor such as a tunnel excavation system is driven, the results of this study are expected to be a stable and effective method for solving the start-up current problem and designing the power receiving facility.