This Paper deals with the short circuit tests of the three-Phase DC reactor type fault current limiter (FCL) in changing of turns ratio of transformers. The experiment of this paper is a preliminary step to develop the FCL's faculties for an application to high voltage transmission line. So, superconducting coil was made of Nb-Ti, low temperature superconductor, and the ratings of the power system of experimental circuit are 400V/7A class. A three-phase DC reactor type FCL consists of three transformers, six diodes, one superconducting coil and one cryostat. The important point of experimental analysis is transient period, the operating lagging time of circuit breaker. As the results of the experiment, the values are referred to the limitation rate about 77% and 90% when the turns ratio of transformer was 1:1 and 2:1 respectively.
In this paper, a novel space vector control method for isolated multi-level inverter using 3-phase low frequency transformers is proposed. This method is based on the simplification of the space-vector diagram of a five-level inverter using calculated table into fully programming method. The execution time of the proposed method is about same as that of the method using calculated table. Also, the proposed method is easily applied to other case level inverter. We applied this method into the 3-phase IHCML inverter using common arm. It makes possible to use a single DC power source due to employing low frequency transformers. In this inverter, the number of transformers could be reduced compare with an exiting 3-phase multi-level inverter using single phase transformer. In addition, this method generates very low harmonic distortion operation with nearly fundamental switching frequency. Finally, We tested multi-level inverter to clarify electric circuit and reasonableness through Matlab simulation and experiment by using prototype inverter.
본 논문에서는 전력용 변압기 내부의 이상원인을 규명하는 방법중 가장 신뢰성이 우수한 가스분석기법에 대한 새로운 알고리즘을 제시하였다. 제시된 알고리즘은 한전 유중가스 분석법을 포함한 국제적으로 공인된 IEC법, Domenburg법, 가스 Pattern법 등을 통합하여 적용하므로써 진단의 효율성을 높였으며, 미국 Neuron DATA사에서 개발한 Element Expert Tool로 작성되었다. 또한, 실제 이상이 발생된 전력용 변압기의 유중가스치를 제안된 알고리즘에 적용하여 신뢰성을 입증하였다.
본 논문은 LVI 시험기를 개발하여 모델 변압기 및 유입식 변압기에 적용해 LVI 시험 분석기술을 개발하였다. LVI시험기는 본체, 터미널 박스 및 케이블로 구성하였고, ANSI규격에서 요구하는 출력특성을 갖도록 설계 제작하였다. 모델 변압기는 탭들을 만들어 변압기의 권선변형 모델을 만들 수 있도록 하였고, 유입식 변압기는 실제 현장에서 사용되는 3상 변압기이다. LVI 시험기는 펄스폭이 1000 ㎱ 이하의 파두 시간과 펄스 최대 전압 500 V로 제작되었다. LVI 시험기로써 실험을 실시하여 성능을 평가한 결과 측정된 파형 분석으로 권선의 축방향과 반경방향으로의 움직임을 구별할 수 있어 변압기 예방 진단에도 효과가 기대된다.
The electric power subsystems (EPS) of most remote sensing satellites consist of a solar array as a source of energy, a storage battery, a power management and control (PMC) unit and a charge equalization unit (CEU) for the storage battery. The PMC and CEU use high frequency transformers in their power modules. This paper presents a design, implementation and testing results of a high frequency transformer for the EPS of satellite applications. Two approaches are used in the design process of the transformer based on the pre-determined transformer specifications. The transformer is designed based on an ETD 29 ferrite core. The implemented transformer consists of one center-tapped primary coil with eleven center-tapped secondary coils. The offline calculation results and measured values of R, L for transformer coils are convergence. A test circuit for measuring the transformer parameters like voltage, current and B-H hysteresis was implemented and applied. The test results confirm that the voltage waveforms of both primary and secondary coils were as desired. No overlapping occurred between the control signal and the transformer, which was not saturated during testing even during a short circuit test of the secondary channels. The dynamic B-H loop characteristics of the used transformer cores were measured. The sample test results are given in this paper.
Most of the causes of the failures of power transformers in operations are mechanical defects due to vibration. To identify these causes, the vibration phenomenon was measured from the power transformers in operation in the substations under the Daejeon power transmission district office of KEPCO. The measurement was performed in a 6${times}$4 structure on one side of the transformer. The vibration of the measured points was presented in 2D and 3D, and analyzed. The results according to the period in use of the transformer and the load applied to the transformer were analyzed. These results will be used as basic data to establish the vibration standard for the power transformer, In addition, with a load capability and vibration phenomenon correlation and regression analysis to identify by way of function was reached. And the vibration phenomenon pass a years with changes and to analyze correlation, was estimated to bring in the function. And then through the analysis of power transformers to set standards based on vibration data was used to.
This paper reports an investigation of overvoltages caused by ferroresonance in the distribution system, which consists of a bank of open-delta single-phase voltage transformers. The high voltage sides of the voltage transformer are connected to the distribution system via three single-phase fuse cutouts. Due to the saturation characteristic of the transformer cores, ferroresonance can occur in the condition that the transformer is energized or deenergized with single-phase switching operation of the fuse cutouts. The simulation tool based on EMTP is used to investigate the overvoltages at the high side of voltage transformer. Bifurcation diagrams are used to present the ferroresonance behavior in ranges of different operating conditions. The simulation results are in good agreement with the results from the experiment of 22 kV voltage transformers. The mitigation technique with additional damping resistors in the secondary windings of the voltage transformers will be introduced. Brief discussion will be made on the physical phenomena related to the overvoltage and the damage of voltage transformer.
Park, Dae-Won;Jo, Hyang-Eun;Kim, Sun-Jae;Kil, Gyung-Suk
Journal of Electrical Engineering and Technology
/
제8권6호
/
pp.1468-1473
/
2013
This paper dealt with the propagation characteristics of acoustic signals produced by partial discharges and the positioning of PD origin in insulation oil to develop insulation diagnostic techniques of oil-immerged transformers. Electrode systems such as needle to plane, plane to plane, and particle electrodes were fabricated to simulate some defects of power transformers. In addition, the frequency spectrum and propagation characteristics of acoustic signals with partial discharge (PD) in insulation oil were analyzed. Although there were differences based on the type of defect, the frequency spectra of the acoustic signals measured by wide and narrow band acoustic emission (AE) sensors were distributed in the range of 50 kHz-400 kHz. Therefore, a narrowband AE sensor is suitable for the diagnosis of oil-immersed power transformers. We could find the position of the PD source with an error margin of 10% in the experiments by calculating the position of the PD occurrence using the time difference of arrival measured by five AE sensors.
Mehdizadeh, Sina;Yazdchi, Mohammadreza;Niroomand, Mehdi
Journal of Electrical Engineering and Technology
/
제8권6호
/
pp.1487-1496
/
2013
In this paper, a novel algorithm for PD localization in power transformers based on wavelet de-noising technique and energy criterion is proposed. Partial discharge is one of the main failures in power transformers. The localization of which could be very useful for maintenance systems. Acoustic signals due to a PD event are transient, irregular and non-repetitive. So wavelet transform is an efficient tool for this signal processing problem that gives a time-frequency demonstration. First, different wavelet based de-noising methods are analyzed. Then, a reasonable structure for threshold value determining and applying manner on signals is presented. Evaluated errors are good evidences for choices. Next, applying the elimination low energy frequency bands is discussed and developed as a de-noising method. Time differences between signals are used for PD localization. Different ways in time arrival detection are introduced and a novel approach in energy criterion method is presented. At the end, the quality of algorithm is verified through the different assays in lab.
Stability and reliability of a power system in many respects depend on the condition of power transformers. Essential devices as power transformers are in a transmission and distribution system. Being one of the most expensive and important elements, a power transformer is a highly essential element, whose failures and damage may cause the outage of a power system. To detect the power transformer faults, dissolved gas analysis (DGA) is a widely-used method because of its high sensitivity to small amount of electrical faults. Among the various diagnosis methods, Rogers diagonsis method has been widely used in transformer in service. But this method cannot offer accurate diagnosis for all the faults. This paper proposes a fault diagnosis method of oil-filled power transformers using PNN(Probability Neural Network) based Rogers diagnosis method. The test result show better performance than conventional Rogers diagnosis method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.