• Title/Summary/Keyword: transformers

Search Result 1,167, Processing Time 0.029 seconds

A Study on the Peak Load Prediction for Molter-use Distribution Transformer (동력용 배전 변압기의 최대부하 예측 개선 방안에 관한 연구)

  • Park, Kyung-Ho;Kim, Jae-Chul;Yun, Sang-Yun;Lee, Young-Suk;Park, Chang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.530-532
    • /
    • 2002
  • The contracted electric power and the demand factor of customers are used to predict the peak load in distribution transformers. The conventional demand factor was determined more than ten years ago. The contracted electric power and power demand have been increased. Therefore, we need to prepare the novel demand factor that appropriates at present. In this paper, we modify the demand factor to improve the peak load prediction of distribution transformers. To modify the demand factor, we utilize the 169 data acquisition devices for sample distribution transformers. The peak load currents were measured by the case studies using the actual load data, through which we verified that the proposed demand factors were correct than the conventional factors. A newly demand factor will be used to predict the peak load of distribution transformers.

  • PDF

Estimation of the circulating currents in the parallel operation of transformers (변압기 병렬운전시 순환전류 추정)

  • Kang, Yong-Cheol;Lee, Mi-Sun;Lee, Byung-Eun;Jang, Sung-Il;Kim, Yong-Gyun;Joo, Haeng-Ro
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.23-24
    • /
    • 2008
  • For the $Y-Y-{\Delta}$ transformers operated in parallel, there exist two kinds of the circulating currents i.e. between the tanks and between the banks of the delta side. The proposed algorithm estimates the two circulating currents in the transformers in parallel in an ultra high voltage system. As the circulating current between the tanks is 90 deg out of phase of the load current, it is estimated by decomposing the line current into the component 90 deg out of phase of the load current. The circulating current between the banks in the delta side is estimated from the delta winding current and the line currents. The performance of the proposed algorithm is investigated when the impedances of the two transformer tanks are different or the taps of the on-load tap changer of the transformers are mismatched temporarily. Test results indicate that the algorithm can estimate the two kinds of the circulating currents successfully for both cases.

  • PDF

A Study on the Assignment of the Vibration Classes to the Power Transformers in Operation (154[kV])

  • Kim, Young-Dal
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.11
    • /
    • pp.52-60
    • /
    • 2009
  • High reliability is essential for power transformers, and their fault causes are reportedly more related to mechanical causes than electrical ones. The transformer soundness judgment currently depends only on the electrical insulation characteristic and the chemical test of the insulation oil, so that there are few fundamental measures against the frequent mechanical damages and failures in transformers. The mechanical soundness judgment techniques are conducted through processes that include structural analysis and vibration resistance treatment during the manufacturing process of each manufacturer, but the vibration is not tested during the design, manufacturing, and operating processes since there are no detailed technical standards and procedures on the vibration problem, which are important in terms of maintenance. Therefore, in this study, vibration phenomena were measured from the 32 power transformers in operation in the substations under the Daejeon Power Transmission District Office of the Korean Electric Power Corporation (KEPCO). The vibration was measured at 24 sections ($6{\times}4$) on one side, and only the maximum values were selected from the measured vibration values. This was because the maximum vibration values more significantly affect the soundness of the transformer than the average vibration values. The vibration classes were given considering the maximum vibration based on ISO 10016-1 (2001).

A New Phase Shift Full Bridge Converter with Serially Connected Two Transformers (직렬 연결된 두 개의 트랜스포머를 갖는 새로운 위상 천이 풀 브릿지 컨버터)

  • 구관본;김태성;문건우;윤명중
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.7 no.5
    • /
    • pp.443-452
    • /
    • 2002
  • A new phase shift full bridge (PSFB) converter with serially connected two transformers for telecommunication equipments of several hundred watts is proposed. The main features of the proposed converter are a wide input voltage range, an easiness to meet the requirement for zero voltage switching (ZVS) condition at a light load, and a small output voltage ripple. Furthermore, the serially connected two transformers can replace both a main transformer and an output inductor since the two transformers act as not only a main transformer but an output inductor by turns. Therefore, there is no need to use an output inductor, then the proposed converter features high power density. A mode analysis, design equations through a large signal modeling, and experimental results are presented to verify the validity of the proposed converter.

The Study on the HBML Inverter Using the Cascaded Transformers (변압기 직렬구성을 이용한 HBML 인버터에 관한 연구)

  • 박성준;박노식;강필순;김광헌;임영철;김철우
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.9 no.4
    • /
    • pp.334-340
    • /
    • 2004
  • In this paper, an efficient switching pattern to equalize the size of transformer is proposed for a multi-level inverter employing cascaded transformers. It is based on the prior selected harmonic elimination PWM(SHEPWM) method. Because the maximum magnetic flux imposed on each transformer becomes exactly equal each to each, all transformers can be designed with the same size regardless of their position. Therefore, identical full-bridge inverter units can be utilized, thus improving modularity and manufacturability. The fundamental idea of the proposed switching pattern is illustrated and then analyzed theoretically. The validity of the proposed switching strategy is verified by experimental results.

Fault Pattern Analysis and Restoration Prediction Model Construction of Pole Transformer Using Data Mining Technique (데이터마이닝 기법을 이용한 주상변압기 고장유형 분석 및 복구 예측모델 구축에 관한 연구)

  • Hwang, Woo-Hyun;Kim, Ja-Hee;Jang, Wan-Sung;Hong, Jung-Sik;Han, Deuk-Su
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.9
    • /
    • pp.1507-1515
    • /
    • 2008
  • It is essential for electric power companies to have a quick restoration system of the faulted pole transformers which occupy most of transformers to supply stable electricity. However, it takes too much time to restore it when a transformer is out of order suddenly because we now count on operator in investigating causes of failure and making decision of recovery methods. This paper presents the concept of 'Fault pattern analysis and Restoration prediction model using Data mining techniques’, which is based on accumulated fault record of pole transformers in the past. For this, it also suggests external and internal causes of fault which influence the fault pattern of pole transformers. It is expected that we can reduce not only defects in manufacturing procedure by upgrading quality but also the time of predicting fault patterns and recovering when faults occur by using the result.

Improvement Method of Peak Load Forecasting for Mortor-use Distribution Transformer by Readjustment of Demand Factor (호당 수용률 조정을 통한 동력용 배전 변압기 최대부하 예측 개선 방안)

  • Park, Kyung-Ho;Kim, Jae-Chul;Lee, Hee-Tea;Yun, Sang-Yun;Park, Chang-Ho;Lee, Young-Suk
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.41-43
    • /
    • 2002
  • The contracted electric power and the demand factor of customers are used to predict the peak load in distribution transformers. The conventional demand factor was determined more than ten years ago. The contracted electric power and power demand have been increased. Therefore, we need to prepare the novel demand factor that appropriates at present. In this paper, we modify the demand factor to improve the peak load prediction of distribution transformers. To modify the demand factor, we utilize the 169 data acquisition devices for sample distribution transformers in winter, spring summer. And, the peak load currents were measured by the case studies using the actual load data, through which we verified that the proposed demand factors were correct than the conventional factors. A newly demand factor will be used to predict the peak load of distribution transformers.

  • PDF

THE NEW THICK-FILM HYBRID CONVERTERS FOR HALOGEN AND FLUORESCENT LAMPS

  • Gondek, J.;Dzialek, K.;Kocol, J.;Kawa, B.
    • Proceedings of the International Microelectronics And Packaging Society Conference
    • /
    • 2001.04a
    • /
    • pp.57-65
    • /
    • 2001
  • Economical consumption of energy, longer life of lamps, higher lighting comfort and new aesthetic of illumination is subject of numerous research and development works. The halogen lamps are an example of positive solution some of above mentioned problems. The electronic transformers are more frequent used for their supply. In comparison with conventional transformers they have less weight, less volume and 60% less power tosses. Their advantages are particular visible, when the hybrid technique is applied. The paper presents the results of engineering research and development works carried out ill Private Institute of Electronic Engineering, in R. & D. Center for Hybrid Microelectronics and Resistors and in Technical School of Communications in Krakow, in the field of the design and exploitation tests of hybrid converters 220V AC /12V DC (electronic transformers) and electronic ballasts destined for the supply of halogen lamps 20W to 150W and fluorescent lamps respectively. To perform the converters, thick film technology and surface mount technology were used. For the protection of converter electronic circuit the thick film temperature sensor and transistors were applied. Moreover the paper presents the base application circuits of elaborated converters, their technical parameters and exploitation results. The development perspectives of hybrid domain of hybrid circuits are also discussed.

  • PDF

A Study on the Application of SFCL on 22.9 kV Bus Tie for Parallel Operation of Power Main Transformers in a Power Distribution System (배전계통에 전력용 변압기 병렬운전시 22.9 kV SFCL Bus Tie 적용방안에 관한 연구)

  • On, Min-Gwi;Kim, Myoung-Hoo;Kim, Jin-Seok;You, Il-Kyoung;Lim, Sung-Hun;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.1
    • /
    • pp.20-25
    • /
    • 2011
  • This paper analyzed the application of Superconducting Fault Current Limiter (SFCL) on 22.9 [kV] bus tie in a power distribution system. Commonly, the parallel operations of power main transformers offer a lot of merits. However, when a fault occurs in the parallel operation of power main transformer, the fault currents might exceed the interruption capacity of existing protective devices. To resolve this problem, thus, the SFCL has been studied as the fascinating device. In case that, Particularly, the SFCL could be installed to parallel operation of various power main transformers in power distribution system of the Korea Electric Power Corporation (KEPCO) on 22.9 [kV] bus tie, the effect of the resistance of SFCL could reduce the increased fault currents and meet the interruption capacity of existing protective devices by them. Therefore, we analyzed the effect of application and proposed the proper impedance of the R-type SFCL on 22.9 [kV] bus tie in a power distribution system using PSCAD/EMTDC.

Estimation of the Circulating Currents in the Parallel Operation of Transformers (변압기 병렬운전시 순환전류 추정)

  • Kang, Yong-Cheol;Lee, Mi-Sun;Lee, Byung-Eun;Choi, Jae-Sun;Jang, Sung-Il;Kim, Yong-Gyun;Lyu, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2147-2152
    • /
    • 2008
  • This paper proposes an algorithm to estimate the circulating currents in the transformers in parallel in an ultra high voltage system. For the Y-Y-${\Delta}$ transformers operated in parallel, there exist two kinds of the circulating currents i.e. one is between the tanks and the other between the banks of the delta side. As the former is 90 deg out of phase of the load current, it is estimated by decomposing the line current into the component 90 deg out of phase of the load current in the frequency domain. The latter is estimated in the time domain from applying the Kirchhoff's voltage law on the delta winding which gives a first-order differential equation in terms of the delta winding currents. To estimate the circulating currents between the tanks, the performance of the proposed algorithm is investigated when the impedances of the two transformer tanks are different or the taps of the on-load tap changer of the transformers are mismatched temporarily. To estimate the circulating currents between the banks, the performance of the proposed algorithm is also examined under magnetic inrush and over-excitation. Test results indicate that the algorithm can estimate the two kinds of the circulating currents successfully.