• Title/Summary/Keyword: track irregularity

Search Result 162, Processing Time 0.025 seconds

The Growth friend Analysis of Rail Surface Irregularity according to the Types of Track (궤도구조별 레일두부 표면요철의 성장 경향 분석)

  • Sung, Deok-Yong;Kong, Sun-Yong;Kim, Bag-Jin;Shin, Hyo-Jeong;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.369-375
    • /
    • 2009
  • The Periodic replacements criterion of rail is calculated on the basis of the research result of RTRI in Japan. It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In order to establish the periodic replacements criterion of CWR, this study measured the rail surface irregularity according to the accumulated passing tonnage, the types of track system and welding. Therefore, it is analyzed that the gas pressure welding is the worst one of the others. In addition, it is analyzed that the rail surface irregularity growth rate in ballast track is about $0.02{\sim}0.03mm$/100MGT and its in concrete track is about $0.005{\sim}0.02mm$/100MGT Finally, the result of this study is able to use the basis data to establishing the periodic replacements criterion of CWR considering rail grinding.

  • PDF

Real-time prediction of dynamic irregularity and acceleration of HSR bridges using modified LSGAN and in-service train

  • Huile Li;Tianyu Wang;Huan Yan
    • Smart Structures and Systems
    • /
    • v.31 no.5
    • /
    • pp.501-516
    • /
    • 2023
  • Dynamic irregularity and acceleration of bridges subjected to high-speed trains provide crucial information for comprehensive evaluation of the health state of under-track structures. This paper proposes a novel approach for real-time estimation of vertical track dynamic irregularity and bridge acceleration using deep generative adversarial network (GAN) and vibration data from in-service train. The vehicle-body and bogie acceleration responses are correlated with the two target variables by modeling train-bridge interaction (TBI) through least squares generative adversarial network (LSGAN). To realize supervised learning required in the present task, the conventional LSGAN is modified by implementing new loss function and linear activation function. The proposed approach can offer pointwise and accurate estimates of track dynamic irregularity and bridge acceleration, allowing frequent inspection of high-speed railway (HSR) bridges in an economical way. Thanks to its applicability in scenarios of high noise level and critical resonance condition, the proposed approach has a promising prospect in engineering applications.

A Study of Reinforcement of Railway Structure Approaches in Conventional line (기존선 철도구조물 접속부의 보강에 대한 고찰)

  • Park, Joon-Oh;Lee, Sang-Bae;Kim, Kwan-Hyung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.442-452
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and this influences passenger's comfort and the safety of operation, and it needs more track maintenance. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF

The Prediction Equation for Bending Stress of Rail in Concrete Track by the Linear Multiple Regression Analysis (중회귀분석을 통한 콘크리트궤도 레일 휨응력 예측식)

  • Sung, Deok-Yong;Lim, Hyoung-Jun;Lee, Dong-Wook;Kim, Bag-Jin;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.315-323
    • /
    • 2010
  • It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, it measured bending stress of rail according to the rail surface irregularity in the concrete track on the Seoul Metro. In addition, the relationship between rail surface irregularity and bending stress in concrete track is analyzed by results of the field test. Finally, this study clarified the relationship among bending stress(Y) of rail, train speed(U), rail surface irregularity(v, w) in concrete track. The result of this study is able to use the basis data to establishing the periodic replacements criterion of CWR.

  • PDF

Measurement and analysis of support stiffness of the track which rubber ballast-mat installed (방진자갈매트구간 궤도지지계수 측정 및 분석)

  • Yang, Shin-Chu;Lee, Jee-Ha;Kim, Eun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1071-1076
    • /
    • 2007
  • In high-speed line, at some part of the track which rubber ballast-mat installed, track irregularity grew rapidly and affected riding comfort and train running stability. It is urgently requested to establish counter-measures which can be applied to track under operation. To do this, it is very important to analysis the origin of that phenomenon before. Track support stiffness is an essential factor for evaluating track condition. Sudden changes of support stiffness along track occur instability of train and bad riding comfort. Preventing sudden changes of track support stiffness is a key technique in high-speed track maintenance. Besides the sudden changes, the magnitude itself also significantly affects track and train. Low stiffness of ballast-mat makes ballast acceleration area wider. And it may accelerate track irregularity growth. So, the stiffness should be limited. To calculate track stiffness, measuring load and displacement on track is needed. In this study, the behavior of the track which rubber ballast-mat installed was measured and analyzed to understand the origin of rapid growth of it.

  • PDF

Evaluation of Track Irregularity Effect due to Adjacent Excavation on Serviced Railway Line (철도시설물 인접굴착공사에 따른 운행선 궤도의 궤도틀림 영향 평가)

  • Choi, Jung-Youl;Park, Dong-Ryong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.401-406
    • /
    • 2019
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, sleepers, and track elastic springs(ballast, rail pad). As a result of analyzing the track deformation level of the existing tracks due to the excavation work adjacent to the railway facilities, it was found that the track irregularity evaluation criteria (allowed values) of both conventional and high-speed railways lines were satisfied. Based on the numerical analysis using the track model, it was analyzed that the results of the prediction of the track irregularity due to the excavation work and the level of the track deformation occurring at the actual site could be approximated as closely as possible.

Application of Time-Series Model to Forecast Track Irregularity Progress (궤도틀림 진전 예측을 위한 시계열 모델 적용)

  • Jeong, Min Chul;Kim, Gun Woo;Kim, Jung Hoon;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.25 no.4
    • /
    • pp.331-338
    • /
    • 2012
  • Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, characteristics and problems of the detected track irregularity data have been analyzed and efficient processing techniques were developed to solve the problems. The correlation between track irregularity and seasonal changes was conducted based on ARIMA model analysis. Finally, time series analysis was carried out by various forecasting model, such as regression, exponential smoothing and ARIMA model, to determine the appropriate optimal models for forecasting track irregularity progress.

Analysis of Short Grinding Effect on Removing of Surface Irregularities of Rail Welding Joint (레일용접부 요철 제거의 국부연마 효과 분석)

  • Woo, Byoung-Koo;Lee, Syeung-Yeol;Kim, Myung-Soo;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.684-691
    • /
    • 2010
  • Rail is one of major track components for train service, it should be provided in the condition of flat and smooth driving aspect. Therefore, it is inevitable that there would be the field welding to integrate on CWR(Continuous Welded Rail) removing rail joint in these days. It is high chance to be some rail surface irregularity due to the limitation on the status of work condition If a high speed train runs on the rail surface irregularity in the welding part, big impact load comes to pass on that, so track irregularity cycle is reduced, therefore track maintenance cost can be increased. this paper has analyzed wheel load variation according to removing the rail surface irregularity using portable grinding machine in the high speed line. The result measured before and after in the field is decreased about 9.26% on the wheel load variation.

  • PDF

Study for Progress Rate of Standard Deviation of Irregularity Based on Track Properties for the Railway Track Maintenance Cycle Analysis (궤도 유지보수 주기 예측을 위한 구간 특성에 따른 궤도틀림 표준편차 진전정도 분석)

  • Jeong, Min Chul;Kim, Jung Hoon;Lee, Jee Ha;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.31-40
    • /
    • 2012
  • The irregularity of railway track affects not only the comfort of ride such as noise or vibration but also the safety of train operation. For this reason, it is an interesting research area to design a reliable and sustainable railway track system and to analyze the train movement mechanism based on systematic approaches considering reasons of track irregularity possible in a specific local environment. Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, progress rate of standard deviation of irregularity is quantified. During the computation, some important components of railways such as rail joint, ballast, roadbed, and fastener have been considered. Probabilistic distributions of irregularity growth with respect to time are computed to predict the remaining service life of railway track and to be adapted for the safety assessment.

Identification of Track Irregularity using Wavelet Transfer Function (웨이브렛 전달함수를 이용한 궤도틀림 식별)

  • Shin, Soo-Bong;Lee, Hyeung-Jin;Kim, Man-Cheol;Yoon, Seok-Jun
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.3
    • /
    • pp.304-308
    • /
    • 2010
  • This paper presents a methodology for identifying track irregularity using a wavelet transfer function. An equivalent wavelet SISO (single-input single-output) transfer function is defined by the measured track geometry and the acceleration data measured at a bogie of a train. All the measured data with various sampling frequencies were rearranged according to the constant 25cm reference recording distance of the track recording vehicle used in the field. Before applying the wavelet transform, measured data were regressed by eliminating those out of the range. The inverse wavelet transfer function is also formulated to estimate track geometry. The closeness of the estimated track geometry to the actual one is evaluated by the coherence function and also by FRF (frequency response function). A track irregularity index is defined by comparing the variance of the estimation error from the intact condition and that from the current condition. A simulation study has been carried out to examine the proposed algorithm.