• Title/Summary/Keyword: time-delayed signals

Search Result 52, Processing Time 0.022 seconds

A Study on the Improvement for the Substitute Block System of the Conventional Line (기존선 대용폐색방식 개선에 관한 연구)

  • Song, Nak-Kyoon;Kim, Hae-Gon;Kim, Ho-Soon;Kim, Dae-Sik;Joo, Chang-Hun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.545-555
    • /
    • 2011
  • Presently, The Regular Block System(Automatic, Interlocking block system) is usually used during the operation of block section. However, In case that the regular block system fails because of the failure of the fixed signals and block equipment or in case of the unexpected emergency which should drive on the single line due to the accidents in the double line section or the repair work of the single line, the Substitute Block System to use the driving permission license(mapping ticket and paper) is used. In case of the operation of the opposite line and the temporary one line, the safety gets worse and the SBS may cause the fatal accidents such as a head-on & a rear-end collision. Also, the unmanned railroad stations has recently increased owing to the effective operation of the stations, for it is difficult to execute the SBS in their absence. As a result, the increase of the operation time made the train delayed. Being on the rise of these problems, in this study, we analyzed the problems and difficulties of the SBS on one line which is lacking stability and safety and on the sections combined between maned and unmaned railroad stations. And we proposed the suitable method in KORAIL referring to the examples of European & Japan railways lately. According to the passing of the high tech time, If the new SBS equipped with stability and safety is executed, it will contribute to the effective operation of trains and the satisfaction of KORAIL customers in the future.

  • PDF

A Study on the Improvement for the Implement Way of a Substitute Block System (대용폐색방식 시행방법 개선에 관한 연구)

  • Song, Nak-Kyoon;Kim, Hae-Gon;Kim, Ho-Soon;Joo, Chang-Hun;Kim, Dae-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1860-1871
    • /
    • 2011
  • Presently, The Regular Block System(Automatic, Interlocking block system) is usually used during the operation of block section. However, In case that the regular block system fails because of the failure of the fixed signals and block equipment or in case of the unexpected emergent situation which should drive on the single-track due to the accidents in the double-track section or the repair work of the one-track, the Substitute Block System to make use of the driving permission license(mapping ticket, mapping paper) is used. In case of the operation of the opposite line and the temporary one-track, the safety gets worse and the SBS may cause the fatal accidents such as a head-on & a rear-end collision. Also, the unmanned railroad stations has recently increased owing to the effective operation of the stations, for it is difficult to execute the SBS in their absence. As a result, the increase of the operation time made the train delayed. Being on the rise of these problems, in this study, we analyzed the problems and difficulties of the SBS on the single line which is lacking stability and safety and on the sections combined between maned and unmaned railroad stations. And we proposed the method to improve the existing drive permission license used for 50 years into the brand-new one with state-of-the art technology and scientific way. In the era of the 21th century, Carrying out the new SBS equipped with stability and safety, we will contribute to the effective operation of trains and the satisfaction of our customers in the future.

  • PDF