• Title/Summary/Keyword: time delays

Search Result 890, Processing Time 0.023 seconds

Stability and Robust H Control for Time-Delayed Systems with Parameter Uncertainties and Stochastic Disturbances

  • Kim, Ki-Hoon;Park, Myeong-Jin;Kwon, Oh-Min;Lee, Sang-Moon;Cha, Eun-Jong
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.200-214
    • /
    • 2016
  • This paper investigates the problem of stability analysis and robust H controller for time-delayed systems with parameter uncertainties and stochastic disturbances. It is assumed parameter uncertainties are norm bounded and mean and variance for disturbances of them are known. Firstly, by constructing a newly augmented Lyapunov-Krasovskii functional, a stability criterion for nominal systems with time-varying delays is derived in terms of linear matrix inequalities (LMIs). Secondly, based on the result of stability analysis, a new controller design method is proposed for the nominal form of the systems. Finally, the proposed method is extended to the problem of robust H controller design for a time-delayed system with parameter uncertainties and stochastic disturbances. To show the validity and effectiveness of the presented criteria, three examples are included.

An analysis of the causes of prehospital delays in patients with suspected acute stroke (급성 뇌졸중 의심 환자의 병원 전 지연 원인 분석)

  • Lee, Nam-Jin;Moon, Jun-Dong
    • The Korean Journal of Emergency Medical Services
    • /
    • v.24 no.2
    • /
    • pp.27-38
    • /
    • 2020
  • Purpose: Stroke is a time-sensitive disease that could have reduced complications and mortality with timely diagnosis and treatment. This study aimed to analyze the causes of delay in detecting the clinical signs and symptoms of stroke. Methods: This retrospective observational study analyzed the emergency medical services reports of suspected stroke patients with positive predictive values on the Cincinnati Prehospital Stroke Scale. The study was conducted in Daejeon, Republic of Korea from January 1, 2016 through December 31, 2017. Results: Prolonged prehospital time was associated with high blood pressure, history of cerebrovascular disease, and incidences during daily activities, and sleep. High blood pressure and complications from a previous stroke strongly associated with the prolonged stroke-detection phase (p<.05). Total prehospital time was shortened when patients had evident stroke symptoms, such as decreased level of consciousness, dysarthria, and hemiplegia (p<.05). There was no significant difference in gender or age as a factor that delayed the total prehospital time of the suspected stroke patients. Conclusion: Many patients did not recognize the early clinical symptoms and signs of a stroke. Furthermore, risk factors, such as high blood pressure and history of stroke, prolonged the total prehospital time. Therefore, we need targeted interventions that educate about warning symptoms of stroke, along with emphasis on the importance of emergency calls to substantially reduce the prehospital delays.

Prediction-Based Routing Methods in Opportunistic Networks

  • Zhang, Sanfeng;Huang, Di;Li, Yin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.10
    • /
    • pp.3851-3866
    • /
    • 2015
  • The dynamic nature of opportunistic networks results in long delays, low rates of success for deliveries, etc. As such user experience is limited, and the further development of opportunistic networks is constrained. This paper proposes a prediction-based routing method for opportunistic networks (PB-OppNet). Firstly, using an ARIMA model, PB-OppNet describes the historical contact information between a node pair as a time series to predict the average encounter time interval of the node pair. Secondly, using an optimal stopping rule, PB-OppNet obtains a threshold for encounter time intervals as forwarding utility. Based on this threshold, a node can easily make decisions of stopping observing, or delivering messages when potential forwarding nodes enter its communication range. It can also report different encounter time intervals to the destination node. With the threshold, PB-OppNet can achieve a better compromise of forwarding utility and waiting delay, so that delivery delay is minimized. The simulation experiment result presented here shows that PB-OppNet is better than existing methods in prediction accuracy for links, delivery delays, delivery success rates, etc.

제어 응용에 있어서 CORBA, DCOM 및 TSPACE의 시간 특성 연구

  • 박홍성;강원준;김형육;김경식;강정모
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.548-548
    • /
    • 2000
  • This paper measures and compares time delays between CORBA, DCOM, TSpaces Objects designed for distributed control systems. To compare time delay for each object, this paper implements the ball and beam control system. And the reasons of delay have been studied.

  • PDF

Position estimation of underground acoustic source origin using a passive SONAR system (수동형 SONAR 시스템을 사용한 지하 진원지의 추정)

  • Jarng Soon Suck;Lee Je Hyeong;Ahn Heung Gu;Choi Heun Ho
    • Proceedings of the Acoustical Society of Korea Conference
    • /
    • spring
    • /
    • pp.103-108
    • /
    • 1999
  • The aim of the work described in this paper is to develop a complex underground acoustic system which detects and localizes the origin of an underground hammering sound using an array of hydrophones located about loom underground. Three different methods for the sound localization will be presented, a time-delay method, a power-attenuation method and a hybrid method. In the time-delay method, the cross correlation of the signals received from the array of sensors is used to calculate the time delays between those signals. In the power-attenuation method, the powers of the received signals provide a measure of the distances of the source from the sensors. In the hybrid method, both informations of time-delays and power-ratios are coupled together to produce better performance of position estimation. A new acoustic imaging technique has been developed for improving the hybrid method. This new acoustic imaging method shows the multi-dimensional distribution of the normalized cost function, so as to indicate the trend of the minimizing direction toward the source location. For each method the sound localization is carried out in three dimensions underground. The distance between the true and estimated origins of the source is 28m for a search area of radius 250m.

  • PDF

New method development for position estimation of underground acoustic source using a passive SONAR system

  • Jarng, Soon-Suck;Lee, Je-Hyeong;Ahn, Heung-Gu;Park, Heun-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1999.10a
    • /
    • pp.149-152
    • /
    • 1999
  • The aim of the work described in this paper is to develop a complex underground acoustic system which detects and localizes the origin of an underground hammering sound using an array of hydrophones located about loom underground. Three different methods for the sound localization will be presented, a time-delay method, a power-attenuation method and a hybrid method. In the time-delay method, the cross correlation of the signals received from the way of sensors is used to calculate the time delays between those signals. In the power-attenuation method, the powers of the received signals provide a measure of the distances of the source from the sensors. In the hybrid method, both informations of time-delays and power-ratios are coupled together to produce better performance of position estimation. A new acoustic imaging technique has been developed for improving the hybrid method. For each method the sound localization is carried out in three dimensions underground. The minimum distance between the true and estimated origins of the source is 28 m for a search area of radius 250m.

  • PDF

Development of Control System of High-speed ATC of Machining Center (Machining Center의 고속 ATC 제어 시스템의 개발)

  • Han, Dong-Chang;Lee, Dong-Il;Song, Yong-Tae;Lee, Seok-Gyu
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.19 no.9
    • /
    • pp.125-132
    • /
    • 2002
  • We use a compound-cam twin arm structure and random tool access method to achieve a faster ATC (Automatic Tool Changer) system for the accurate position and rotation control of a tool magazine and an exchange am. Based on the data obtained from various sensors, it is possible to follow the sequence of commands in each control step for an exchange arm. However, it is not so easy to reduce the exchange time of the system because of the slow responses of the sensors and execution mode delays of PLC (Programmable Logic Controller) scan time. In this paper, we propose a new programmed limit-switch position control method to obtain the shortest possible delays for the random tool access method and compound-cam twin arm structure. With some experimental results, we have achieved below 0.9sec tool exchange time with the proposed method.

New Acoustic Imaging Method Development for Localization of an Underground Acoustic Source Using a Passive SONAR System

  • Jarng, Soon-Suck
    • The Journal of the Acoustical Society of Korea
    • /
    • v.18 no.2E
    • /
    • pp.10-17
    • /
    • 1999
  • The aim of the work described in this paper is to develop a complex underground acoustic system which detects and localizes the origin of an underground hammering sound using an array of hydrophones located about 100m underground. Three different methods for the sound localization will be presented, a time-delay method, a power-attenuation method and a hybrid method. In the time-delay method, the cross correlation of the signals received from the array of sensors is used to calculate the time delays between those signals. In the power-attenuation method, the powers of the received signals provide a measure of the distances of the source from the sensors. In the hybrid method, both informations of time-delays and power-ratios are coupled together to produce better performance of position estimation. A new acoustic imaging technique has been developed for improving the hybrid method. This new acoustic imaging method shows the multi-dimensional distribution of the normalized cost function, so as to indicate the trend of the minimizing direction toward the source location. For each method the sound localization is carried out in three dimensions underground. The distance between the true and estimated origins of the source is 28m for a search area of radius 250m.

  • PDF

A novel smart criterion of grey-prediction control for practical applications

  • Z.Y. Chen;Ruei-yuan Wang;Yahui Meng;Timothy Chen
    • Smart Structures and Systems
    • /
    • v.31 no.1
    • /
    • pp.69-78
    • /
    • 2023
  • The purpose of this paper is to develop a scalable grey predictive controller with unavoidable random delays. Grey prediction is proposed to solve problems caused by incorrect parameter selection and to eliminate the effects of dynamic coupling between degrees of freedom (DOFs) in nonlinear systems. To address the stability problem, this study develops an improved gray-predictive adaptive fuzzy controller, which can not only solve the implementation problem by determining the stability of the system, but also apply the Linear Matrix Inequality (LMI) law to calculate Fuzzy change parameters. Fuzzy logic controllers manipulate robotic systems to improve their control performance. The stability is proved using Lyapunov stability theorem. In this article, the authors compare different controllers and the proposed predictive controller can significantly reduce the vibration of offshore platforms while keeping the required control force within an ideal small range. This paper presents a robust fuzzy control design that uses a model-based approach to overcome the effects of modeling errors. To guarantee the asymptotic stability of large nonlinear systems with multiple lags, the stability criterion is derived from the direct Lyapunov method. Based on this criterion and a distributed control system, a set of model-based fuzzy controllers is synthesized to stabilize large-scale nonlinear systems with multiple delays.

An Efficient Service Scheduling for Decrease Waiting Time Based on Internet VOD (인터넷 VOD 서비스에서 대기시간 감소를 위한 효율적인 사용자 스케줄링)

  • Choi, Seong-Wook
    • Journal of the Korea Computer Industry Society
    • /
    • v.8 no.3
    • /
    • pp.197-206
    • /
    • 2007
  • The waiting delays of internet VOD users are inevitable in this policy since the services are not taken immediately upon requests but upon every scheduling points. An inefficient management of such delays makes an unfair service to users and increases the possibility of higher reneging rates. This paper proposes an efficient service scheduling scheme which improves the average waiting time of users requests and reduces the starvation problem of users requesting less popular movies. Experimental results of simulations show that the proposed scheme improves about 20 percentage of average waiting time and reduces significantly the starving requesters comparing with those of conventional methods such as FCFS and MQL.

  • PDF