• Title/Summary/Keyword: timber piled stabilization

Search Result 1, Processing Time 0.014 seconds

Stabilization Method by Timber Pile for Fill Slope Failure on Forest Road (임도(林道) 성토사면(盛土斜面)의 소경재(小經材) 붕괴억지공법(崩壞抑止工法)에 관한 연구(硏究))

  • Ji, Byoung Yun;Jung, Do Hyun;Kim, Jong Yoon;Cha, Du Song
    • Journal of Forest and Environmental Science
    • /
    • v.17 no.1
    • /
    • pp.104-115
    • /
    • 2001
  • This study was carried out to to execute the slope stabilization scheme of soil and weathered rock slope with forest road generating slope failure due to heavy rainfall. The timber piled stabilization by Shin's formulae for landslide-restraint pile as elastically supported elastic columns under distributed loads was applied on the unstable fill slope. The results obtained were summarized as follows: The timber piled stabilization was applied for unstable slopes such as the soil slope and weathered rock slope of metamorphic rock regions. The results indicated that pile interval of 0.5~1.0m was appropriate in the case of high hillslope gradients and 0.7~2.0m in the case of low hillslope gradients of soil slope, and Pile interval of 0.5~1.3m in the case of high hillslope gradients and 0.7~2.0m in the case of low hillslope gradients of weathered rock slope. Recommended pile length was around 4m for pile 1, 2 and 3, and nearly 3m for pile 4 and 5.

  • PDF